An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SARA’s LHC network pieter@sara.nl – www.sara.nl LHC OPN meeting - April 4, 2006

  2. Contents • http://www.this-page-intentionally-left-blank.org/ LHC OPN meeting - April 4, 2006

  3. Status • SC4 infrastructure not yet in place (actually still SC3 rerun stuff) • Problem with OC192 cards in Geneva SURFnet box LHC OPN meeting - April 4, 2006

  4. To do • Equipment finally ordered • Needs to be build • Waiting for delivery of OPN’s • SARA-CERN OPN • SARA-FZK • SARA-RAL??? • BGP • SARA AS1126 new block 145.100.32.0/22 • 145.100.3.80/28 will be fased out • Backup’s • Other Tier-1 (FZK) • GEANT2 via SURFnet LHC OPN meeting - April 4, 2006

  5. LHC OPN meeting - April 4, 2006