Interstellar Heliopause Probe (IHP) System Design of a Challenging Mission to 200 AU. M. Leipold, Kayser-Threde GmbH. ISSS 2010, New York, July 19 – 22, 2010. Overview. Study Team Propulsion Trade-Off Mission/Trajectory Analysis Spacecraft Architectural Design Mass and Power Budgets.

mahlah
Download Presentation

M. Leipold, Kayser-Threde GmbH

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Interstellar Heliopause Probe (IHP) System Design of a Challenging Mission to 200 AU M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  2. Overview • Study Team • Propulsion Trade-Off • Mission/Trajectory Analysis • Spacecraft Architectural Design • Mass and Power Budgets M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  3. Study Team - Optical Communication Option M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  4. Propulsion Options Assessed for IHP • A) High Thrust Chemical Propulsion (CP) (Isp = 320s ... 370s; Cryogenic first stage Isp = 470s), incl. Nuclear Thermal Propulsion (NTP) • B) Mixed High/Low Thrust Propulsion • C) Nuclear Electric Propulsion (NEP) with Isp = 5,000s ... 10,000s • D) Solar Sail Propulsion (SSP) with ac = 0.75 .. 3.0 mm/s2 Assumed Launch Mass to GTO for Options A), B) and C): < 3,020 kg Assumed Launch Mass to Earth Escape for Option D): < 2,030 kg (Kourou) M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  5. Preliminary Spacecraft Architectural Design for NEP-Concept Power Subsystem + Radiation Shield Deployable Truss S/C Bus with Payload Payload PWRE Booms 2 x 35m Payload „Core“ Magnetometer Boom 7-8m M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  6. Propulsion Trade-Off Result • High thrust (conventional) propulsion incl. gravity assists proved to be infeasible for 25 year flight time and transported mass of ca. 200 kg • Mixed high thrust / low thrust also not feasible • NEP scenarios infeasible given the launch vehicle constraint of SOYUZ-FREGAT • Solar Sail option was selected as baseline • Solar Sail scenarios show performance requirement of 1 mm/s2 to realize flight times of appr. 25 years to reach 200 AU, i.e. depending on minimum solar approach distance M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  7. Scenarios: Low Thrust Solar Sail Propulsion M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  8. Optimized Transfer Result & Navigation Strategy Strategy: „Dual Solar Photonic Assist“ • 1st aphelion: 1.05 AU • 1st perihelion: 0.51 AU • 2nd aphelion: 5.76 AU • 2nd perihelion: 0.25 AU ODYSSEE Low-Thrust Optimization, 2004 Note: Trajectory not optimized for escape asymptote direction to nose of Heliopause M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  9. Evolution of Solar Distance • Total time of Flight: 25.5 years • Cruise Phase until 5 AU: 6.7 years (Sail jettisoned) • Max. Sail Turn Rates: 28.6°/ day, or 1.2°/hour Conclusions: it pays off to spend more time in the inner solar system by increasing the orbit eccentricity Sail jettisoned M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  10. IHP Launch Configuration HIPS HGA LGA RTG Deployable Booms Sail Container Fairing LV Adapter M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  11. Sail Deployed 20m Central Control Mast 2DOF Gimbal IHP Platform Boom Deployed Sail Container (open) M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  12. Spacecraft Architectural Design: Science Mode 35m Plasma-Wave Experiment Boom 8m Magnetometer Boom Highly Integrated Payload Suite M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  13. IHP Science Payload • Total of 8 instruments accommodated • Total mass: 20.9 kg incl. subsystem margin M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  14. Platform Concept (incl. Science Platform) M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  15. AOCS • Maximum turn rate sailing mode: 29°/day (heliocentric, near sun) • Pointing stability science mode: 0.5° • Life time: • sailing mode: ca. 6.5 years • science mode: ca. 19 years • Minimum mechanical complexity • Sailcraft controllability for first natural frequency of 0.0065 Hz • Coherent AOCS design for sailing mode and science mode (sensors etc.) • Need to design two different ADCS for IHP M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  16. Sail Control Schemes Trade-Off M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  17. IHP AOCS Architecture M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  18. IHP Sail ADCS Analysis IHP Sail Configuration • Moments of inertia = (433000, 433000, 865000) kg-m2 • cm-cp offset = 0.525 m (0.25% of 210 meter sail edge) • SRP Thrust =Fmax= PA = 0.3621 N • where,  is the sail efficiency (1.8 assumption), P is the SRP constant P = 4.536 x 10-6 N/m2 at 1 AU, A is the projection area (210 x 210 m2) • NSRP , SRP Disturbance torque = F (cm-cp) =0.189 N-m • Angular momentum storage/dumping > (NSRP )(3600 s)= 680 N-m-s per hour • Use a 0.65 deg/s spin rate for 0.5 deg pointing accuracy, 1-2 rpm M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  19. Intermediate ACS-Results: • MATLAB Simulations • 35 deg in 6 hrs • 20m Mast • 210 x 210 m • 200 kg science s/c • 400 kg total mass • Gimbal angle < 5 deg M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  20. Launch Vehicle Accommodation on SOYUZ-FREGAT (Fairing Type ST) SOYUZ-FREGAT M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  21. IHP Mass Budget: Platform + Sail M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  22. Summary • IHP showed that advanced Solar Sails can outperform Nuclear Electric Propulsion for High-Dv Missions in Deep Space • IHP provided important results for sailcraft ACS simulations and sail controllability • IHP helped to define the technology requirements and the definition of a solar sail technology roadmap for ESA

  23. Thermal Control Concept Couplings:Bus – Radiator: 2 Heat pipes per radiator; C = 2.5 W/K eachBus – RTG: 0.1 W/K eachBus – Antenna: 0.25 W/KInstruments – Radiator: 0.07 W/K totalInstruments – Boom: 0.09 W/K total RTG shield: reflective High temperature MLIwith reflective outer layereffective emittance: 0.025total area: ca. 4 m² RTG: black coateddecoupled from bus Bus Radiators: black coatedSize: 0.1m² each Instrument Radiator: black coatedSize: 0.08m² M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010

  24. Operations Candidate Ground Stations • New Norcia • Villafranca del Castillo, Spain • Weilheim, Germany Only small modifications are required for ground stations Downlink Data Rate at Ka Band: • 1 kbps downlink during cruise phase up to 6 AU • 200 bps downlink up to 200 AU • 4h per week contact time planned (average) M. Leipold, Kayser-Threde GmbH ISSS 2010, New York, July 19 – 22, 2010