An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Information Technology UpdateUniversity of Alabama at Birmingham Sheila M. Sanders August 30, 2005

  2. Updates/Activities underway • SCT Banner Student Information System (SIS) • Current Activities • Budget • Proposed West IT site expansion project • Equipment room expansion – Education Bldg. • Telephone System upgrade and expansion – Rust/Education

  3. Student System Activities • SCT Project management and functional consultants are on site • Project team training completed in these areas • Navigation • General Person • Recruiting/Admissions/Advancement – Mid-September • Portal Project kick off – September 20, 2005

  4. Student System Budget Expenditure CategoryBudgetPaid YTD Software $1,240,914 $1,190,914 Hardware/Storage 866,000 91,034 SCT Support Training, Functional and technical 6,008,652 Other technical 845,000 Contingency 500,000 Total Project Budget:$9,460,566 $1,281,948

  5. IT Equipment Environment-today UAB has two main IT Equipment Sites Central IT site - Rust Bldg. (1801 University Blvd.) • Equipment housed at this site: • Servers for our Administrative Systems • Mainframe – current Student Information System • Main telephone system • Email servers • Network equipment • Internet routers • Areas served • Research buildings • Medical Center • East side of campus West IT site – Education Bldg. (901 13th St. South) • Provides network and telephone services • Serves Academic buildings and Residence Halls

  6. IT Equipment Environment- proposed • Expand West IT site space • Current space cannot accommodate future growth in this area of the UAB Campus • Distribute IT services more evenly between the Central and West IT site • Redundancy of services in case of disaster • Upgrade the UAB Telephone System • New architecture upgrade will allow fail over between the West and Central IT sites for disaster recovery purposes • Expansion to accommodate growth of the UAB campus and Medical Center • Existing Nortel Switch will remain in tact with software upgrade to protect UAB’s investment

  7. Next Steps • Review by Physical Properties Committee in September • Approval to proceed with the architect/engineer selection • Develop specifications and requirements for a competitive bid process for the telephone system upgrade

  8. Information Technologyat the University of Alabama at Birmingham Questions?