1 / 5

Original Bid to PPARC Shock Tests Target Tests at ISOLDE & ISIS Pion Optimisation Activation

Original Bid to PPARC Shock Tests Target Tests at ISOLDE & ISIS Pion Optimisation Activation Heat Dissipation Distributions Target Station Design Safety Total Cost £19.3M. PPARC Review Supported Shock Studies Allocated £650k. Costs, PPARC submission, August 2003,

mahola
Download Presentation

Original Bid to PPARC Shock Tests Target Tests at ISOLDE & ISIS Pion Optimisation Activation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Original Bid to PPARC • Shock Tests • Target Tests at ISOLDE & ISIS • Pion Optimisation • Activation • Heat Dissipation Distributions • Target Station Design • Safety • Total Cost £19.3M

  2. PPARC Review • Supported Shock Studies • Allocated £650k

  3. Costs, PPARC submission, August 2003, by Cranfield University £k RA 188 PHD STUDENT 40 TECHNICIAN, 50% OF EFFORT 59 EQUIPMENT 307 TOTAL COST 600 Prof. N.K. Bourne RMCS, Cranfield 3 months Prof. Alec Milne FGE 3 months

  4. Selected priorities: • Shock studies at Cranfield University – £600k • Dave Picton, from Birmingham University, for Heat Dissipation Distributions - £6k • Bennett – £34k • Tests on ISOLDE - £10k

  5. WP3 Target Staff No./year Measurement of parameters required for computer modelling of shock. Sheffield New RA 1 Simulation of particle production, development of target scheme. Glasgow New RA 0.5 Oversight, development of test, prototyping and target activity RAL-PPD Edgecock 0.5 Development of target scheme New RA 0.5 Oversight of target work package RAL-ISIS Bennett 0.25 Mechanical/electrical design of test equipment RAL-ED Engineering 0.3 Implementation of parameter-measurement devices RMCS Technician 0.5 COSTS £k Total staff 340+310 Equipment (includes VAT) 300 Experiment at ISOLDE 10 Consumables (includes VAT) 30 Travel 50 Total 650+390

More Related