Agenda. Safety Topic Overview of Agenda Introductions Richard Rife, Deputy Project Manager Lori Baker, Acquisition Services Manager Behle Burns, Design Manager John Walczyk, Construction Area Superintendent Evan Carlson, Field Procurement Manager
E N D
Agenda • Safety Topic • Overview of Agenda • Introductions • Richard Rife, Deputy Project Manager • Lori Baker, Acquisition Services Manager • Behle Burns, Design Manager • John Walczyk, Construction Area Superintendent • Evan Carlson, Field Procurement Manager • Glenn Franklin, Project Procurement Manager
Overview • Identification, Prequalification and Selection of Potential Bidders – What is the process and what are the requirements • Request for Proposal – Section by Section Review • Complete Proposals – What does it take to provide a complete proposal • eRFP (Electronic Request for Proposal) R:/Administration/Presentation/SubcontractorTraining/Prequalification Requirements for Subcontractors June 2006
Prequalification ProcessPotential Bidders List • Potential Bidders are identified as follows: • Bechtel Global Supplier Information System • Expressions of Interest through the BGCAPP Website • Industrial Search Engines (Thomas Register, Construction Blue Book, etc.) • Small Business Advocate input
http://supplier.bechtel.com • Information needed by Supplier for FREE Registration • Dunn and Bradstreet Number • Bonding capacity, bid range • Annual sales • Area of expertise, work experience to enter commodity code information • Business size classification
Identification, Qualification and Selection of Potential Bidders Prequalification • Procurement Professional issues Prequalification Requirements to Potential Bidders • Potential Bidders MUST respond completely and timely • Subcontractor’s Certification Form to be completed/signed • Satisfactory completion of the Prequalification requirements normally qualifies that the prospective offeror will be issued an RFP (Request for Proposal) • Prequalification Requirements are unique to each Request for Proposal (Scope of Work). • Prequalification Requirements will typically be divided between • Commercial • Technical
Identification, Qualification and Selection of Potential Bidders • Commercial • Is the potential supplier capable of furnishing a complete scope for the materials/equipment? • Contact Information has been completed • Similar Scope Experience List, including a summary of performance and Customer Contact Information • Audited Financial Statements and/or current Comprehensive Dun and Bradstreet Report
Identification, Qualification and Selection of Potential Bidders 2) Technical • Is the Bidder capable to perform the Scope of Work? • What is the Bidder’s experience with this Scope of Work? • Do they have capable personnel? • What work is Subcontracted? (Work performed by others) • Does the Bidder have an acceptable QA Program (e.g. ISO Certificate, or Table of Contents) ? • Shop Capacity, and Work Load - does the Bidder have the ability to meet the shipment schedule?
Request for Proposal • BGCAPP will issue formal, written Request for Proposals (RFP) for all permanent plant equipment • The content for each RFP will be unique depending on the requirements of the Material Requisition. • An RFP typically includes the following documents: • Request for Proposal Letter (including attachments) • Information and Instructions to Bidders • Representations and Certifications • Commercial Form of Proposal (including attachments) • Technical Form of Proposal (Evaluation criteria)
RFP Form of Proposal • ALL FIELDS MUST BE COMPLETE! If field is not applicable state N/A
RFP Section 2 Technical Specifications 2.4 – Technical Notes 2.3 – Drawings
RFP - Section 3Drawings and Data Requirements G321-E SAMPLE
G321-EX SAMPLE RFP - Section 3Drawings and Data Requirements
G321-V - SAMPLE RFP - Section 3Drawings and Data Requirements
Product Name: Adhesion Promoter AP8000 Issue Date: 11/09/2005 Print Date: 10 Aug 2006 * Indicates a Trademark Page 1 of 8 The Dow Chemical Company encourages and expects you to read and understand the entire (M)SDS, as there is important information throughout the document. We expect you to follow the precautions identified in this document unless your use conditions would necessitate other appropriate methods or actions. Material Safety Data Sheet Product Name:Adhesion Promoter AP8000 Issue Date: 11/09/2005 Print Date:10 Aug 2006 * Indicates a Trademark Page 1 of 8 The DowChemical Company encourages and expectsyou to read and understand the entire (M)SDS, as there is important information throughout the document. We expect you to follow the precautions identified in this document unless your use conditions would necessitate other appropriate methods or actions. The Dow Chemical Company
RFP– Sections 4a, Flow-Downs, and Section 4b • Section 4a: General Conditions • Flow-Downs (Appendix FOA-1) are an appendix of the General Conditions and are specific points contained in our Prime Contract that MUST BE flowed down to the Suppliers • Section 4b: Special Conditions • Remember, exceptions to Terms and Conditions is an evaluation consideration!
INSPECTION RFP - Section 5Supplier Quality Surveillance
RFP Section 6 Expediting Instructions • Expediting Instructions offer specific guidance on submission of: • Schedules • Progress reports • Organization charts • Seller purchase orders • Packing lists • Shop loads/schedules • Supplier Deviation Disposition Requests • BUYER’s Expediting Contact
RFP Section 7 Packing, Marking, and Shipping Instructions Provides specific instructions on the requirements for Packing, Marking and Shipping equipment/goods including US Export Control Compliance
RFP Section 8 Invoicing Instructions • Invoicing Instructions are provided to summarize the Invoice payment process requirements. It includes instructions on: • Payment Terms (where they are located) • Electronic Payment • Invoice Preparation Instructions • Bechtel Electronic Funds Transfer Authorization Form FAILURE TO PROVIDE A PROPERLY PREPARED INVOICE MAY RESULT IN THE INVOICE BEING REJECTED!
RFPRepresentations and Certifications • Representations and Certifications are required with all proposals. This document requires the Offeror to make Representations and Certifications about their company. • Reps and Certs must be completed by an authorized agent of the company • Failure to complete Reps and Certs may result in removal of your proposal from further consideration
Complete ProposalsWhat constitutes a complete proposal? • The million dollar question, literally. It is IMPERATIVE that a Bidders proposal is complete and on time. Incomplete or untimely proposals may not be considered. • What it takes to provide a complete proposal: • READ THE ENTIRE RFP. Even if you are an experienced offeror, the requirements may change from RFP to RFP. It is IMPERATIVE that Bidders read and understand the entire RFP. • In a typical RFP, the following documents are required to be provided with the proposal: • Any requirements of the Information and Instruction to Bidders. Examples are as follows: • Financials • Experience Statements • Copies of Code Stamps • Resumes • Execution Plans • Copy of QA Manuals
Complete Proposals What constitutes a complete proposal? • Continued • A completed Form of Proposal. • THAT MEANS NO BLANKS. EVERY FIELD SHOULD BE FILLED OUT, IF IT IS NOT APPLICABLE, TELL US! • Include all attachments, such as (but not limited to): • Optional Pricing Worksheets • Unit price breakdowns • A summary of Commercial or Technical Exceptions (if any) • Technical Form of Proposal, including any submittal requirements • A completed Section 1 Scope of Work and Pricing. If your company requires you to use a specific application to provide an offer, that’s fine, but the Section 1 document must be complete! • Signed and dated Representations and Certifications form.
ReviewWhat you should know now • QUESTIONS?
Procurement Status 32% Complete
Forecast of Acquisitions • Construction Materials • Construction Equipment, Tools, & Consumables • Trucks and Gators • Welding Machines, Shop Fabrication Equipment • Construction Materials • Electrical Materials • Miscellaneous and Specialty Fabrication Pipe/Fitting/Valves/Pumps/Flanges Schedule is subject to change!
Forecast of Acquisitions • Engineered Equipment & Materials • Vertical Embeds • Carbon Steel Pressure Vessels • Bridge Monorail Crane • Stainless Steel, Carbon Steel Clad & High Alloy Pressure Vessels • Jib Crane • Observation Windows • Evaporative Coolers • Chiller and Air Compressors • Shield Doors
Forecast of Acquisitions • Subcontracts and Service Contracts • Potable Fire/Water Tanks • Firewater Pump House • Non-Destructive Examination Services • Architectural Doors, Windows & Hardware • Snow Removal & Road Sweeping • Parking Lot Paving • Personnel Maintenance Building • Utility Building • Laboratory Building
BGCAPP Project Website Website Link: www.bechtelparsonsbgcapp.com • Please click on the link below to view a forecast of upcoming opportunities • Construction and Services • Awarded Company-138kv Main Substation and Pole Lines • Awarded Company- Maintenance Building • Awarded Company- Personnel Support Building • Engineered Equipment • Materials
Tips for Doing Business with Bechtel Parsons Blue Grass • Complete and current registration on Bechtel Supplier and Contractor Portal • Look for opportunities on the project website • Market directly to project via Small Business Advocate and other Acquisition staff • Identify small business socioeconomic status • Complete documents for prequalification • Fully read and understand Request for Proposal • Ask questions
Contact Information Diane Osbourne Small Business Program Advocate 301 Highland Park Dr. Richmond, KY 40475 (859) 624-6204 dosbourn@bechtel.com