An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the H2 beam line- in view of Primary Ion run Adrian Fabich, MEF-LE 13th May 2014

  2. Safety • Personal Protection Equipment inside the green line (= beam zones + central corridor) • Safety shoes • Helmet • Specific precautions required for the primary ion run in early 2015 • Interlock chain in SPS • Bend limitations • Increased shielding of H2 in EHN1 A. Fabich

  3. H2 operation As experienced in previous runs • With a reasonable setup time we gain a lot in overall run efficiency • More efficient (cleaner) recording of events • Higher rate of interesting events • Less unnecessary data to be analysed (filtered) • Less time for changes between energy swaps at a later stage Liaison physicist: Adrian A. Fabich

  4. Primary Ion Operation The potential extraction of a proton beam (max. 3*1013) on a Primary Ion cycle to the SPS-NA must be excluded: • SPS interlock • exclude extraction of an SPS beam with more than 2*1011 charges per cycle. • Two dedicated, redundant BCTs installed • Bend limitations: • Procedural safety: • SPS protons extracted only >400 GeV • Primary ions extracted only at 380 GeV (<400 GeV) • In Primary Ion operation the transfer dipoles are limited (HW) to 390 GeV. A. Fabich

  5. H2 shielding • Achieve legal RP limits in corridors and barracks • Also during accidental beam loss upstream of PPE152 • Additional shielding (min. 80 cm concrete equivalent) • PPE132 and 142: fully covered to protect personnel in corridor and workshop • PPE152: lateral shielding up to 2 m above first floor • Effort • About 300 concrete blocks • about 200 kChF project costs (incl. blocks, person power, modifications of existing installations) A. Fabich

  6. PPE132/142 shielding A. Fabich

  7. PPE152 shielding • Only lateral • No roof cover beam Central passage NA61 target beam A. Fabich

  8. Modifications to NA61 And some minor re-arrangements to the concrete block floor in the zone A. Fabich

  9. Other EHN1 modifications • EHN1 clean-up during 2013 • About 80 trucks of material removed • Wood, metal, unidentified left-overs … • New GAMMA IRRADIATION FACILITY • Operational from Autumn 2014 • No impact on H2 layout • Also foreseen: removal of target station T24 (H4) A. Fabich

  10. Beam instrumentation • SBA instrumentation NOT in vacuum: • 131 m: MWPC + Scintillator (retractable) • 264 m: Trigger (retractable) • 385 m: MWPC + Scintillator (retractable) • 461 m: MWPC + Scintillator (retractable) • 527 m: 2x XDWC (fix) + Scintillator (retractable) 535 m: NA61 target • This equipment is mandatory - at least for setting up! • Other BI like FISCs etc. • NA61 vacuum around S2/V0 • On charge by NA61 • Vacuum elements stored in zone • Theoretically (by removing XDWC) the S2/V0 vacuum can be connected to the SBA vacuum A. Fabich