1 / 17

The University of Arizona’s Medea

The Construction of a Set…. The University of Arizona’s Medea. Research Images. The Cliffs of Moher on the west coast of Ireland . Research Images.

maia
Download Presentation

The University of Arizona’s Medea

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Construction of a Set… The University of Arizona’sMedea

  2. Research Images The Cliffs of Moher on the west coast of Ireland

  3. Research Images A dilapidated Irish cottage, one of many lasting reminders of the horrors of the Irish Potato Famine which halved the population of Ireland by death and emigration beginning in September of 1845. The Famine left a an indelible mark on the psyche of the nation and strengthened the hostilities between the Irish and English who, for the most part, did nothing to help.

  4. Painting What will eventually be a cliff wall section, is painted in the scene shop

  5. Pieces of the Cliff Walls are carved from wood and foam and painted

  6. Construction Construction of the house is underway in the Tornabene Theatre where Medea will ultimately be performed

  7. Construction of the platforms and stairs for the set take place on site in the Tornabene

  8. The Cliffs have been finished and hoisted into place, construction of the platforms continues and other scenic rock pieces are being created and painted

  9. The house, now painted, is taken apart and moved piece by piece into position on the platforms. The size of the platform made it impossible to move ladders around the house to paint it in its final position, thus it was painted on the deck and moved into place later.

  10. The house weighs a few hundred pounds and many hands were needed to move each of the pieces.

  11. The last piece of the house is moved to the platform

  12. The house is in place The house is braced and installed on the platforms

  13. Meanwhile, overhead… The lighting designer, electricians and crew work to hang and eventually cable and focus the lighting instruments on the tension grid above the stage for Medea.

  14. Floor and Props Over the weekend, the floor pieces were painted and installed and large boulders were brought in from a local rock supplier. The prop master has also begun to load in some props.

  15. Flying Techies Techs are using a harness hung from the grid to add details to places that cannot be reached by ladders.

  16. More Paint Painting the rocks… to look like rocks… (one can only assume in an effort to keep a cohesive color scheme and environment).

  17. Keep on working TO BE CONTINUED! As the work goes on, more photos will be added! Last updated Jan 29, 2009

More Related