140 likes | 307 Views
TC SCP TEC STATUS REPORT TO PLENARY #63. Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle. SCP(14)000090r1. Meetings Since Last TC SCP Plenary. SCP TEC #51 10-14 March 2014 Sophia-Antipolis, France (ETSI). Discussions, hot topics (1/4).
E N D
TC SCP TEC STATUS REPORT TO PLENARY #63 Paul JOLIVET, Chairman, LG ElectronicsSebastian HANS, Vice chairman, Oracle SCP(14)000090r1
Meetings Since Last TC SCP Plenary • SCP TEC #51 • 10-14 March 2014 • Sophia-Antipolis, France (ETSI)
Discussions, hot topics (1/4) • General issues, meeting schedule • Meeting organisation • The last meeting was a 5-day meeting • eUICC input represents the biggest part of the workload • Next meetings are all scheduled to be 5 day meetings • Meeting schedule until July 2014 proposed, ongoing checks on dates until the end of year 2014 • eCAT • Corrections to eCAT and eCAT Secure Channel were accepted (CRs provided) • CR were proposed for the API part of eCAT • Postponed for further work • An API ad hoc session (F2F or conference call) to be planned
Discussions, hot topics (2/4) • Embedded UICC (eUICC) • Draft specification • Draft 0.0.5 the specification is available • Input is delivered in pCRs • 2 pCRs were accepted and the draft specification updated accordingly • GSMA specification was attached to a LS to TEC • The document was presented to the meeting although there were objections from some members • There is no intention to copy or reference the full document • It is expected that interested companies will make contributions based on this document if required
Discussions, hot topics (3/4) • Liaison from/to 3GPP CT6 • LS on maximum delay due to NULL bytes • SCP TEC waits feedback from 3GPP2 before making CRs • Postponed to next TEC • LS on optimisation of power consumption of MTC devices • Discussed during the meeting • Postponed for further work at next meeting • LS on removal of 3GPP related text in TS 102 223 • 3GPP specific parameters were spotted • Removal is only possible after checking that 3GPP implement them (in TS 31.111
Discussions, hot topics (4/4) • Contactless API testing • Some LSs and discussion with TEST • Response LS was sent to TEST • Some points were postponed to the next TEC meeting for further work and discussion • Contactless • A LS from NFC Forum was checked on the management of multiple SEs and HCI/NCI • This document was provided for information, no specific action was required, • Waiting for the agreement on requirements • Contactless P2P is put on hold, as there is no new contribution
Documents sent back by Plenary • Coding of the SPI : SCP(14)000045 • Sent back due to security concerns from Oberthur Technologies • The CR was split into two CRs by Orange prior TEC • SCPTEC(14)000013 is postponed for further work • SCPTEC(14)000014r2 was accepted at TEC (and presented to this meeting) • There is an agreement in the group that those CRs can be considered separately
Request for advice • None
Outcome Documents – CRs • List of TEC accepted CRs available in SCP(14)000091r1 • Change Requests • 2 CRs to TS 101 220 • 8 CRs to TS 102 223 • 1 CR to TS 102 225 • 1 CR to TS 102 484 • Statistics: • 12 CRs • Releases: • 1 on Rel-10 • 4 on Rel-11 • 7 on Rel-12 • Categories • 1 Cat A • 1 Cat B • 3 Cat C • 3 Cat D • 4 Cat F
Outcome Documents – WIDs • New WID • None • Updated WID • None
Outcome Documents – TSs • None
Outcome Documents – LSs • LS to SCP • None • LS cc SCP • to 3GPP TSG CT6 : SCP(14)000051r1 - Removing 3GPP related information from TS 102 223 (BCCH, Timing Advance, LND) • to ETSI SCP TEST : SCP(14)000024r5 – Answer to two TEST Clarification requests • Other LS • SCPTEC(14)000047r2 LS to REQ on Naming of off-card entities of the eUICC
Next Steps / Milestones • Open topics: • Contactless P2P • Documents where noted • New input is expected to reopen discussion • Secure Channel API • Input discussed, limited feedback slowly moving topic • eUICC • Long discussions • Exchanges with REQ • High workload expected • and TEI…
Meeting Schedule TC SCP TEC • SCP TEC #52 • 2-6 June 2014 • Seoul, Korea (Samsung) • SCP TEC #53 • 7-11 July 2014 • Sophia-Antipolis, France • SCP TEC #54 • Beginning Oct 2014 • TBC • Conference calls • To be planned depending on participants’ availability • Ad hoc meetings • Potential ad hoc for eCAT API • Other if required • Joint sessions • None scheduled at that stage