1 / 15

專題討論

專題討論. Debris Flow Run Off Simulation and Verification – Case Study of Chen-You-Lan Watershed, Taiwan. 79842018 蔡怡臻 MAR. 19 2010. Debris flow run off simulation and verification – case study of Chen-You-Lan Watershed, Taiwan. 1.Abstract 2.Numerical model of debris flow

makoto
Download Presentation

專題討論

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 專題討論 Debris Flow Run Off Simulation and Verification – Case Study of Chen-You-Lan Watershed, Taiwan 79842018 蔡怡臻 MAR. 19 2010

  2. Debris flow run off simulation and verification – case study of Chen-You-Lan Watershed, Taiwan 1.Abstract 2.Numerical model of debris flow 3.Parametric study of yield stress and viscosity in rheological model 4.Micro-geomorphic analysis of the Chui-Sue River watershed 5.Debris flow simulation of the Chui-Sue River watershed 6.Conclusions

  3. Abstract

  4. Numerical model of debris flow • Continuity equation

  5. Numerical model of debris flow 2. 2-D equations of motion

  6. Numerical model of debris flow 3. Rheological model

  7. Numerical model of debris flow

  8. Parametric study of yield stress and viscosity in rheological model

  9. Parametric study of yield stress and viscosity in rheological model

  10. Micro-geomorphic analysis of the Chui-Sue River watershed

  11. Debris flow simulation of the Chui-Sue River watershed

  12. Debris flow simulation of the Chui-Sue River watershed

  13. Debris flow simulation of the Chui-Sue River watershed

  14. Conclusions • Parameters for the yield and viscous stresses have significant effects on the simulation results. • Adjustment of rheological parameters should take into account the properties of debris. • The numerical model could provide reasonably good results.

More Related