An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical Aspects and Physics of Very Large Volume Neutrino Telescopes VLVnT 2009 13 -15 October 2009 - Athens, Greece “Quality Assurance and Risk Assessment in the KM3NeT Neutrino Telescope Design Study” C.Sollima INFN - University of Pisa for the KM3NeT Consortium

  2. Contents • Introduction and Methodology • Risk Assessment • Quality Assurance • Conclusions C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  3. Introduction: Goals • Define a suitable methodology for RA&QA • Perform a Risk Analysis of design and operation of the telescope, by a suitable methodology for the RA investigation • Define and diffuse the “Quality Culture” • Obtained a common standardisation by an integrated strategy (QA & RA, Health-Safety-Enviroment). C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  4. Introduction: Starting Points 1) Deep study of the overall Project to identify the WPs’ links 2) RA & QA activities in the framework of the KM3NeT Project: • to increase the knowledge about the submarine technologies and neutrinos detection (lesson learned from ANTARES, NEMO & NESTOR Projects) • to prove the reliability of the RA & QA methodology • to identify the weakest points C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  5. Introduction: Methodology Deming Cycle C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  6. Introduction: Methodology • PLAN: • 1STOrganizational Meeting • Deep Study of the project • Find what we need • Find the right questions • Find the less boring • and functional documents layouts • ACT: • Technical Reports: • Writing operations • Control operations • Sending questionnaires • documents recording • Organizational meeting with partners • Do: • Build up Questionnaires (QA - RA) • Questionnaires testing • Sending Questionnaires Deming Cycle • CHECK: • Analyze Answers • Send back Questionnaires and organizational meeting with partners (if necessary) C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  7. Introduction: Methodology RA & QA COUPLING: KM3NeT ROADMAP C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  8. Introduction: Methodology Logic layer structure proposed • Tree logic model in which boxes are also connected each other C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  9. Storey 1 Detection Unit 1 SJB 1 Storey n Storey 1 Detection Unit n Storey n SJB n Introduction: Methodology Each boxes constitute a layer in which components are connected in tree logic C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  10. Risk Assessment Activities • General RA objective: answer to the questions • What can go wrong? • How probable is it ? • What are the consequences? • Qualitative Analysis • Quantitative Analysis • Dependability Analysis (Fast Analysis) C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  11. Risk Assessment: Dependability Analysis • Unrepairable OM and DU, Maintenance 1 week per year. Different configurations • Unrepairable OM and DU, Maintenance 1 month per year. Different configurations C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  12. Risk Assessment: Achievements • Qualification of the methodology and models through many calculations performed on the concept designs • Application of the methodology and models also to the construction and operation life of KM3NeT • Needs to obtain the failure rates of the components: • From database • Government or commercial data • Test • Maintenance is an issue that affects the availability of the detector and the MTTF of the components and systems of KM3NeT detector C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  13. Quality Assurance Activities • Development of the Quality Assurance System according to ISO-9000 family • - Quality Assurance Manual: plan and organization of the activities of KM3NeT in all its phases to insure that the level of quality defined is achieved • - Definition of the Quality plans and general procedures for KM3NeT to be developed and update, once the project and its phases reach a well defined or modified status • - Definition of the Quality management system • - Definition of the Quality management document • - Definition of a Database for the qualification, construction and operation of KM3NeT C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  14. Quality Assurance Activities KM3NeT Quality Management System Quality Assurance Manual Quality Assurance Management Quality Management Documentation Procedures Quality Plans QA Data Base C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  15. Quality Assurance: Quality Manual Quality Assurance Manual Project Management Quality Management System Quality Politics C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  16. Quality Assurance:Quality Management • Definition of the Quality Management Steering Committee Project Management QA manager QA manager for logistic QA manager for production / manufacturing QA manager for integration QA manager for sea operation QA manager database Quality Office Local Quality Manager Local Quality Supervisor C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  17. Quality Assurance: Documentation Quality Management Documentation Identification of the documents Category of the documents History Validation Template Documentation Storage C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  18. Quality Assurance: Procedures Procedures Test Pre-production Storage Production Transportation Assembly Incoming system Packaging Qualification Processes Definition Non conformity management Quality Plan Implementation C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  19. Quality Assurance: Quality Plans Quality Plans Optical Module Storey Deployment Detection unit ……………….. …………….. C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  20. Quality Assurance: Database Database • For Traceability of the components and systems of KM3Netqualification, construction and operation life of KM3NeT • For document management • During the Design study a prototype function was developed: Test report record C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  21. Quality Assurance: Achievements • Development of QA according to ISO 9001 • To be considering the starting point to implement the KM3NeT Quality Standard through the experience gained by the qualification and optimization processes • To be diffuse in KM3NeT collaboration through training on ISO 9000 and KM3NeT QA System. • Development of the database prototype • its future implementation is already planned • Needs to define a qualification process of components systems and to design testes C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  22. Conclusions • RA procedures and models have been developed and qualified • for the qualification, optimization, construction and operation of KM3NeT • QA System has been developed • it is needed to be updated and implemented to become the KM3NeT QA Standard • It is needed to diffuse it by specific training • A prototype database was realized C. Sollima, INFN-Pisa VLVnT09, Athens, 15 October '09

  23. Technical Aspects and Physics of Very Large Volume Neutrino Telescopes VLVnT 2009 13 -15 October 2009 - Athens, Greece “Quality Assurance and Risk Assessment in the KM3NeT Neutrino Telescope Design Study” THANK VERY MUCH FOR YOUR KIND ATTENTION "Design Study for a Deep Sea Facility in the Mediterranean for Neutrino Astronomy and Associated Sciences”