PS VFE & PS/SPD FE Electronics Status and Plans

PS VFE & PS/SPD FE Electronics Status and Plans. 16 January 2008. LPC Clermont. PS/SPD FEB Status, Installation & Inventory. Production & Tests Finished : 112 PS/SPD FEB produced (including 2 prototypes) 100 boards installed in Pit 8 & Functional

mali
Download Presentation

PS VFE & PS/SPD FE Electronics Status and Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont

  2. PS/SPD FEB Status, Installation & Inventory • Production & Tests Finished: 112 PS/SPD FEB produced (including 2 prototypes) 100 boards installed in Pit 8 & Functional 10 spare boards @ LPC & Functional  2A patch 2 problematic boards left @ LPC ( PCB or connector issues ) • Installation Finished: PRS0 to PRS6, FE boards are individually Functional PRS7: No 380 V PSU / ‘burnt’ by inverted pair in power cable connector / connector now repaired C Side: CROC V4 with ‘last’ firmware in all PRS crates A Side: No CROCs

  3. VFE Powering & Cooling • Water cooling is in the pipes since beginning December  No leakage reported since then • All VFE on C side powered simultaneously / ‘All’ Functional • Temperature is Monitored:  varies from 16 ºC (All OFF) to less than 25 º C (All ON) Allowed automatisation of test process Move to calibration tasks

  4. So We Moved Upstairs …

  5. VFE & FE RJ45 Pendant Issue • RJ45 connection FE / VFE is sensitive: • Cable seems well plugged mechanically but impedance miss-match on one of the 4 pairs •  Loss of signal amplitude: up factor ~10 •  Reflections: seen with LED flashes for ~0.2 % of channels • During cabling: • False connections @ both FE/VFE side: ~2% cables • Post cabling: • False connection ‘appear’ @ rate ~0.2% / monthonly on FE side • But, constant human activity on the ECAL platform … ‘Automated’ Test on PSDAQHVC01W of RJ45 VFE to FE connection: measure pedestal noise ‘we keep an eye on this’

  6. RJ45 RJ45 RJ45 RJ45 VFE Sagita Pendant Issue • Sagita on back of VFE boards  lost of connection for CLOCK signal / Due to: - Stresses through VFE RJ45 cables / in detector movements ? • Statistics: - C side: 7 / 50 VFE lost from may to July 2 / 50 VFE lost from July to September 2 / 50 VFE lost from September to November No loss during December /1 VFE (SM2T-01 still KO) - A side: 2 / 50 VFE lost from may to September No loss from September to December VFE electronics CLOCK VFE connectors RJ45 Signal Signal power Schematics of VFE ( 2 boards + connectors): sagitta caused by ?

  7. DAQ: FEB / CROC Synchronisation From FEB signal to CROC: 2 phaser values to tune for synchronisation • Issue in PRS3 for FEB /CROC synchronisation • Related to DAQ of slots ~4-7 & 8-11 • CROC FE-PGA 2&3 PRS0-2 OK (but data left on PSDAQHVC01W …) KO OK KO OK Valid phases diagram for PRS3 (Over all PRS FEB slots)

  8. DAQ: FE / VFE Synchronisation From VFE signal to FEB FE-PGA: 3 phaser values to tune for synchronisation 1) Sample VFE integration 2) Re-sample in FEB FE-PGA plateau plateau Validity diagrams against ADC phase based on FE & VFE pedestal signals For all FEB/VFE C side fADC multiple of 8 are pathologic plateau

  9. Trigger: PRS Neighbours TOP/BOTTOM PRS Trigger bits TOP/BOTTOM neighbours: Transmitted via RJ45 Errors diagnosed @ data reception for some slots/boards  Systematic problem @ FEB slot #2: No data received !!? ( ) FEBs I/Os validated in Clermont Backplane issues ? Not seen in Clermont Try to re-plug FEBs in faulty slots Tests Trigger ECAL/PRS, PRS/TVB & PRS LEFT/RIGHT (backplane) ongoing some re-cabling on PRS/TVB

  10. Outlook Commissioning / Calibration work ongoing … • DAQ: Phase validity diagrams w/ new CROC Firmware  Issue in PRS3 FEB/CROC phases • Trigger: Link tests ongoing  Issue with some PRS TOP/BOTTOM slots: no data received • Pendant:  VFE CLOCK loss / RJ45 stress  Monitor FE RJ45 connections (~automated)