1 / 21

TERRAMIN AUSTRALIA Limited

TERRAMIN AUSTRALIA Limited. Angas Zinc Project. Water. Topics Water sources Outcomes Risk identification, management, control Mine water demand Modelling (groundwater) Monitoring. MARP Outcome & Criteria. Outcome

malia
Download Presentation

TERRAMIN AUSTRALIA Limited

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TERRAMIN AUSTRALIA Limited Angas Zinc Project

  2. Water • Topics • Water sources • Outcomes • Risk identification, management, control • Mine water demand • Modelling (groundwater) • Monitoring

  3. MARP Outcome & Criteria • Outcome • No adverse impact to the supply of water to existing users and water dependent ecosystems • Criteria • Water to be measured for metals, flow, depth and organic content. All measurements are compared to baseline data.

  4. Management Strategy ZERO DISCHARGE POLICY No contaminate water to leave site All engineering design and placement of infrastructure is set to achieve: ZERO DISCHARGE

  5. Water Sources Sources of water • Rainfall • Permanent surface water • Ephemeral surface water • Ground water • Waste water

  6. Water sources • Mine is Eastern Mount Lofty Ranges, part of the prescribed surface water area and Murray River Catchment, adjacent to Angas-Bremer prescribed wells area • Waters in the location of the mine • Burnside Creek (ephemeral) • Angas River • Aquifers: shallow and deep • Surface water runoff (storm events) • Flood plains (storm events) • Council Sewage Treatment Ponds

  7. Catchments map

  8. Water users Regional • Users of Angas Catchment - surface & groundwater • Users of Lake Alexandrina water Local • Two current properties have shallow bores • Mains water • Waste water from Lagoons - Polo Club, Olive grove

  9. Management Actions • TSF - lined - Zero discharge • Water storages - lined dams - Zero discharge • Surface water management - clean/”dirty” separated - designed for ARI 1:100 • Waste water lagoons - low permeability rocks & thick crown pillar • Underground & surface process water contained within circuit. • Underground - no flow out to environment – draw-down whilst pumping • If large flows encountered we would pressure grout the walls

  10. Mine water balance

  11. Mine water balance

  12. Mine water balance • Mine will not discharge water • The site is net water negative, with balance of requirements coming from potable supply source (SA Water) • Looking at Reverse Osmosis to reduce SA Water demand

  13. Effluent Ponds • Mine dewatering may intercept some infiltration of sewage ponds, adjacent to Tuckers Swamp • Management: required for high E.Coli and faecal coliforms (measured) - health risk • Current users of effluent – Polo club, Olive grove

  14. Groundwater modelling • AWE: Rick Aldam • Principal Environmental Scientist • Groundwater draw down modelling • To define any cone of depression of groundwater that is undergoing extraction

  15. Groundwater modellingdraw-down

  16. 2 Rain Water circuits1 circuit for water that has contacted mining surfaces1 circuit for uncontaminated surface water

  17. Surface watermonitoring

  18. Ground watermonitoring(plus TSF – 9 bores)

  19. Ambient water typical levels • Plot of metals in drill holes

  20. Ambient water typical levels • Plot of TDS & pH in drill holes

  21. Management Target ZERO DISCHARGE POLICY No contaminate water to leave site All engineering design and placement of infrastructure is set to achieve: ZERO DISCHARGE

More Related