An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1st Site Developed for Plantation near PEPSI Site Prepared under for plantation under Preparation

  2. Before After (Compound wall made by NIA protect sapling)

  3. Schematic plan for Plantation at Naroda GIDC Plot next to PEPSI Entry 25 mtrs • Plantation to be done at 4 x4 mt spacing, in four rows. With every 4th to be a Neem tree • We shall try get below from Director of Garden & Timber Merchant Association • Qty of Plantation that can be done– ( 1450-sapling, 700 creeper) • 125# Pinkeshia • 125# Peltoforum • 125# Gulmohar • 125# Raintree • 125# Neem • 700# Bogun creeper • 700# Karen • We shall also try to get • Ficus religiosa (Pipul) • Timber plant 600 mtrs Creeper Sapling Entry