1 / 6

PLANT ANTIBIOTIC

COMENIUS EUROPEAN PROJECT. PLANT ANTIBIOTIC. IPSIA “Emilio Cavazza” - POMEZIA. Continuous plant to have antibiotic. Prof: A. Lafratta – M. Belardinelli – M. Tiberini Student Andrea Liquori 1^Bmecc. Bioreactor R1 can produced inoculums, then it go to fomenter R2.

malo
Download Presentation

PLANT ANTIBIOTIC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COMENIUS EUROPEAN PROJECT PLANT ANTIBIOTIC IPSIA “Emilio Cavazza” - POMEZIA

  2. Continuous plant to have antibiotic.

  3. Prof: A. Lafratta – M. Belardinelli – M. Tiberini Student Andrea Liquori 1^Bmecc.

  4. Bioreactor R1 can produced inoculums, then it go to fomenter R2. • Ground has been sterilized outside fomenter. • Broth’s coming from R2 goes to cyclone D1 and divide to have 2 parts : • Each-one with a lot of penicillin go Bach to fomenter, • Another will filter by F1 and will cool until 2-5 degrees by E1. • Filtered solution goes to D2 and there mixed to H2SO4 to have • Acid penicilline.

  5. Acid penicillin goes to extractor P1 with butyl-acetate that can dissolve acid penicillin. • Penicillin’s concentration is 75-80%, solution goes to activate carbon column C1, by pump G2 solution goes to D3 without • Impurities. • Solution reacts with sodium or potassium citrate to precipitate penicillin’s crystals, to have it must use centrifuge P3 • Penicillin’s crystals goes to transporters to have washing by butyl, than it’ll evaporate by dryer B1

  6. THANK YOU FOR YOUR ATTENCION

More Related