1 / 12

ECAL Shift Duty: A Beginners Guide

ECAL Shift Duty: A Beginners Guide. By Pourus Mehta. Types of Shifts Sub-detector Shifts for ECAL, RPC, HCAL, Tracker, Castor & Pixels Central Shifts: DQM, DAQ, DCS & Trigger Expert On-Call Shifts. Pre-requisites for ECAL Sub-detector Shifts

malory
Download Presentation

ECAL Shift Duty: A Beginners Guide

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ECAL Shift Duty: A Beginners Guide By Pourus Mehta

  2. Types of Shifts • Sub-detector Shifts for ECAL, RPC, HCAL, Tracker, Castor & Pixels • Central Shifts: DQM, DAQ, DCS & Trigger • Expert On-Call Shifts • Pre-requisites for ECAL Sub-detector Shifts • Requirement to take Safety Courses Levels (1, 2, 3 & 4C) for access to CMS- CR & CMS-USC • Need to Study Shift Tutorial • Training Shifts to be taken • Subscription for Shifts through Shift Selection tool

  3. Shifters Duties • Read the Run Field Manager’s Current Plan • Fill the Run Checklist for every run (Run Time > 15 Minutes) • Write an E-Log for any problems or crashes • Monitoring FED Status for all FEDs participating in Global Run • Monitor Central DQM & ECAL DQM for Status of various Parameters • Monitor Beam Status and give feedback to LHC-CR • Take Local Runs incase ECAL (EB + EE) or Preshower (ES) fails • Write Shift Summary • In rare cases, Take control of DCS from central DCS

  4. Run Check-list Plots • Summary Plots • Event Types • Data integrity • FED status • Data occupancy & Data timing • Trigger occupancy & Trigger timing • FED event size • Selective Readout occupancy • Calibration sequence quality • Calibration sequence occupancy (EB & EE) • Laser amplitude & timing • LED amplitude & timing (EE) • Laser fast check • MEM occupancy & integrity • LED system

  5. Event Types Front-End Status Summary Plots

  6. ECAL E-Log

  7. FED Status page

  8. Data Quality Management Portal (Central & ECAL)

  9. Beam Status (Courtesy LHC CR)

  10. Shift Summary Report

  11. Detector Control System (DCS)

  12. THANK YOU

More Related