Topic ENERGY.2012.5&6.1.1 Pilot plant-scale demonstration of advanced post-combustion CO 2 capture processes with a view to integration in fossil fuel power plants Open in call : FP7-ENERGY-2012-2. CO 2 Selective Ceramic Membranes. = CO 2. Flue gas CO 2 N 2 O 2 H 2 O NO X SO X.
E N D
Topic ENERGY.2012.5&6.1.1 Pilot plant-scale demonstration of advanced post-combustion CO2 capture processes with a view to integration in fossil fuel power plants Open in call: FP7-ENERGY-2012-2
CO2SelectiveCeramicMembranes =CO2 Flue gas CO2 N2 O2 H2O NOX SOX Porousmembrane
TraditionalCeramicMembranes 1. top layer 2. top layer 3. top layer Support layer
FlameSynthesis of CeramicMembranes Support Depositet top layer Vaccume Nanoparticles in flame Support tube Top layer Vaccume
Flamereactor Flamearrestor Quarts tube O- ring Mixing unit Air Fuel
Depositionchamber Vaccum pump Poroussubstrate tube Excess air From flamereactor
Vaccum pump Excess air Quarts tube Flamearrestor O- ring Mixing unit Air Precursor Fuel