60 likes | 209 Views
All Experimenters’ Meeting. September 09, 2013. Accelerator Operation Summary. From : September 02, 2013 (0000 hours) To: September 09, 2013 (0000 hours). Calendar Week # 36 NuMI Weekly Integrated Intensity 1.46 E18 protons
E N D
All Experimenters’ Meeting September 09, 2013
Accelerator Operation Summary From : September 02, 2013 (0000 hours) To: September 09, 2013 (0000 hours) Calendar Week # 36 NuMI Weekly Integrated Intensity 1.46 E18 protons BNB Weekly Integrated Intensity 0.0 protons NMuonWeekly Integrated Intensity 0.0 protons MTest Weekly Integrated Intensity 0.0 protons Beam Hours To NuMI ~96.00 hours
Status /Work Completed/Plans • Proton Source • Tuning & Studies • Main Injector • MI8 line lattice measurements • Analyzing Data • Tune Calibration Done • Aperture scans (ring) • Looking at data, will repeat or perform a more detailed scan at questionable locations • SY120 set up • NuMI • Running, increasing intensity • Switchyard • Scanning harmonic quadrupole settings • Establishing QXR operation • New operating point does not properly extract at MI52 • Need to investigate and understand or return to old settings • MTest • Experiment Ready • NMuon • Berm pipe installed • Can see light through pipe
Schedules and Links: • Schedule can be accessed from the Operations Home Page • - Schedules -> Operations Schedule • Direct link to schedule • - http://www-ad.fnal.gov/ops/schedule.html