Pallatana GBCCPP. Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12 Being established by ONGC Tripura Power Company Limited (OTPC) at Pallatana, Tripura. Power Allocation. Power Evacuation System.
E N D
Pallatana GBCCPP • Unit 1 - 363.3 MW – Sch. commissioning : Dec’ 11 • Unit 2 – 363.3 MW – Sch. Commissioning: Mar’ 12 • Being established by ONGC Tripura Power Company Limited (OTPC) at Pallatana, Tripura
Power Evacuation System • Required by December 2011 along with Unit-1 (363.3 MW). • Group -1 • Pallatana Switchyard - OTPC • Pallatana - Silchar T/L – NETC • Silchar sub-station – POWERGRID B. Group -2 • Pallatana- Surajmani Nagar T/L – POWERGRID • Surajmani Nagar sub-station – TSECL C Group -3 • Silchar – Hailakandi T/L – POWERGRID • Hailakandi sub-station – AEGCL D Group -4 • Silchar- Srikona T/L- POWERGRID • Srikona sub-station – AEGCL E Group - 5 • Silchar- PK Bari T/L – POWERGRID • PK Bari sub-station – TSECL
Power Evacuation System (Continued) F. Group - 6 • Silchar- Imphal T/L – POWERGRID • Imphal (new)sub-station – POWERGRID • Group – 7 – POWERGRID • Silchar – Melriat T/L • Melriat (new)sub-station • Group – 8 – POWERGRID • Passighat- Roing – Tezu- Namsai T/L • Roing sub-station • Tezu sub-station • Namsai sub-station I. Group- 9 – POWERGRID • LILO of Kathalguri – Misa T/L at Mariani (new) • Mariani (new) – sub-station • Mariani (new) – Mokochung T/L • Mokochung sub-station • Mokochung (POWERGRID) – Mokochung (Nagaland) T/L
Power Evacuation System (Continued) • Required by March 2012 along with Unit-2 (363.3 MW). • Group -1 • Silchar – Bongaigaon T/L - NETC • Bongaigaon sub-station – POWERGRID B. Group -2 • LILO of Silcahr –Bongaigaon line at Byrnihat sub-station – MeECL • Byrnihat sub-station – MeECL C. Group -3 • LILO of Silcahr –Bongaigaon line at Azara – AEGCL • Azara sub-station – AEGCL