1 / 59

Design of a Low Cost and Robust Linkage Position Sensing System

Design of a Low Cost and Robust Linkage Position Sensing System. Leann Vernon & Phillip Latka Dr. Sanchez November 21, 2013. Outline. Project Summary Block Diagram System Overview Design Requirements System Specifications Preliminary Work Team Schedule Design Process Schedule.

manfredi
Download Presentation

Design of a Low Cost and Robust Linkage Position Sensing System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design of a Low Cost and Robust Linkage Position Sensing System Leann Vernon & Phillip Latka Dr. Sanchez November 21, 2013

  2. Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule

  3. Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule

  4. Project Summary • Client Relationship: Caterpillar • Project Purpose: Replace existing end implement sensing system • Convergence Project • Mechanical Engineer (3), Electrical Engineer (2), Business (4), Advisors (4)

  5. Project Summary • End Implement Location • D8 • System Types • Linkage Position System • Implement Position System

  6. Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule

  7. Block Diagram: Overall System Position (From Environment)

  8. Block Diagram: Linkage Position System Position (From Environment)

  9. Block Diagram: Implement Position Sensor Position (From Environment)

  10. Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule

  11. Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule

  12. Design Requirements • Cost • Includes: Cost of sensor, manufacturing, and installation costs • Benchmark cost based on CAT’s current system: $1,000-$1,500 • Robustness/Reliability • Vibration 8 g • Environmental Conditions • Potential for 10,000 operating hours • Accuracy • Location of Linkage: 0.1mm • Location of End Implement: 0.5 in (1.27 cm)

  13. Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule

  14. System Specifications • Output of Sensor • PWM signal • Low current ~3.8 mA • Up to 5V • Frequency Range 0.1 Hz to 12.8 Hz • Duty Cycle: 3-97%

  15. Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule

  16. Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule

  17. Team Schedule • Mondays 10am • Engineering Group Meeting: Students Only • Wednesday 12pm • Engineering Group Meeting with Advisors • 3rd and 4th week conference call with CAT • Friday 12pm • Team Meeting • Sunday 12pm • Engineering Group Design Meetings: Students Only

  18. Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule

  19. Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs

  20. Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs

  21. Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs

  22. Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs

  23. Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs

  24. Other Pertinent Research • Patent • US7757547 Komatsu • Wheel and Encoder • Linkage Position sensor • Other • 1997 Arthur D. Little Consultation Conference • Idea Comparison • Evaluation Criteria

  25. Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs

  26. Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs

  27. Initial Brainstorming Session • 30 Designs • Sample Designs • Vision Tracking • Ultrasonic • Flow Meter • Gear Tooth Sensor • Barcode

  28. Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs

  29. General Idea Elimination • Mechanical and Electrical Engineers Limited List of 30 Based on Pros and Cons • Pros and cons based on functional requirements • New List of Ideas

  30. Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs

  31. Specific Designs • Laser Distance Sensor • Triangulation • Wheel and Encoder • Sleeve • Push Arm • Magnetometer

  32. Specific Designs • Laser Distance Sensor • Triangulation • Wheel and Encoder • Sleeve • Push Arm • Magnetometer

  33. Specific Designs • Laser Distance Sensor • Triangulation • Wheel and Encoder • Sleeve • Push Arm • Magnetometer

  34. Specific Designs • Laser Distance Sensor • Triangulation • Wheel and Encoder • Sleeve • Push Arm • Magnetometer

  35. Specific Designs • Laser Distance Sensor • Triangulation • Wheel and Encoder • Sleeve • Push Arm • Magnetometer

  36. Specific Designs • Laser Distance Sensor • Triangulation • Wheel and Encoder • Sleeve • Push Arm • Magnetometer

  37. Specific Designs • LiDAR • Triangulation • Wheel and Encoder • Sleeve • Push Arm • Magnetometer

  38. Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule

  39. Schedule • Phase 1 - Project Definition • Phase 2 - Design Phase/Research Application • Phase 3 - Advanced Analysis/Prototyping • Phase 4 - Project Delivery

  40. Schedule

  41. Schedule • Phase 1 - Project Definition • August – Mid October • Phase 2 - Design Phase/Research Application • Phase 3 - Advanced Analysis/Prototyping • Phase 4 - Project Delivery

  42. Schedule: Phase One

  43. Schedule • Phase 1 - Project Definition • Phase 2 - Design Phase/Research Application • Mid October – January • Top Three Ideas to CAT • Agree on Top Solution • Phase 3 - Advanced Analysis/Prototyping • Phase 4 - Project Delivery

  44. Schedule: Phase Two

  45. Schedule • Phase 1 - Project Definition • Phase 2 - Design Phase/Research Application • Phase 3 - Advanced Analysis/Prototyping • January – April • Prototyping (Client Approved) • Phase 4 - Project Delivery

  46. Schedule: Phase Three

  47. Schedule • Phase 1 - Project Definition • Phase 2 - Design Phase/Research Application • Phase 3 - Advanced Analysis/Prototyping • Phase 4 - Project Delivery • April – May • Final Report • Final Presentation

  48. Schedule: Phase Four

  49. M E Group: Andrew Aubry Chris Costello Ken Ratekin Advisors: Dr. Morris Dr. Sanchez Nick Schmidt E E Group: Phillip Latka Leann Vernon Buisness: Nicole Itschner Scott Roth Kinzie Sellers Rose Wurster

  50. Voice of Customer