590 likes | 601 Views
Design of a Low Cost and Robust Linkage Position Sensing System. Leann Vernon & Phillip Latka Dr. Sanchez November 21, 2013. Outline. Project Summary Block Diagram System Overview Design Requirements System Specifications Preliminary Work Team Schedule Design Process Schedule.
E N D
Design of a Low Cost and Robust Linkage Position Sensing System Leann Vernon & Phillip Latka Dr. Sanchez November 21, 2013
Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule
Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule
Project Summary • Client Relationship: Caterpillar • Project Purpose: Replace existing end implement sensing system • Convergence Project • Mechanical Engineer (3), Electrical Engineer (2), Business (4), Advisors (4)
Project Summary • End Implement Location • D8 • System Types • Linkage Position System • Implement Position System
Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule
Block Diagram: Overall System Position (From Environment)
Block Diagram: Linkage Position System Position (From Environment)
Block Diagram: Implement Position Sensor Position (From Environment)
Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule
Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule
Design Requirements • Cost • Includes: Cost of sensor, manufacturing, and installation costs • Benchmark cost based on CAT’s current system: $1,000-$1,500 • Robustness/Reliability • Vibration 8 g • Environmental Conditions • Potential for 10,000 operating hours • Accuracy • Location of Linkage: 0.1mm • Location of End Implement: 0.5 in (1.27 cm)
Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule
System Specifications • Output of Sensor • PWM signal • Low current ~3.8 mA • Up to 5V • Frequency Range 0.1 Hz to 12.8 Hz • Duty Cycle: 3-97%
Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule
Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule
Team Schedule • Mondays 10am • Engineering Group Meeting: Students Only • Wednesday 12pm • Engineering Group Meeting with Advisors • 3rd and 4th week conference call with CAT • Friday 12pm • Team Meeting • Sunday 12pm • Engineering Group Design Meetings: Students Only
Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule
Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs
Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs
Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs
Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs
Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs
Other Pertinent Research • Patent • US7757547 Komatsu • Wheel and Encoder • Linkage Position sensor • Other • 1997 Arthur D. Little Consultation Conference • Idea Comparison • Evaluation Criteria
Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs
Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs
Initial Brainstorming Session • 30 Designs • Sample Designs • Vision Tracking • Ultrasonic • Flow Meter • Gear Tooth Sensor • Barcode
Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs
General Idea Elimination • Mechanical and Electrical Engineers Limited List of 30 Based on Pros and Cons • Pros and cons based on functional requirements • New List of Ideas
Design Process • Researching Stage • Existing CAT System • New Sensor Technology • Other Pertinent Research • Brainstorming Stage • Initial Brainstorming Session • General Idea Elimination • Specific Designs
Specific Designs • Laser Distance Sensor • Triangulation • Wheel and Encoder • Sleeve • Push Arm • Magnetometer
Specific Designs • Laser Distance Sensor • Triangulation • Wheel and Encoder • Sleeve • Push Arm • Magnetometer
Specific Designs • Laser Distance Sensor • Triangulation • Wheel and Encoder • Sleeve • Push Arm • Magnetometer
Specific Designs • Laser Distance Sensor • Triangulation • Wheel and Encoder • Sleeve • Push Arm • Magnetometer
Specific Designs • Laser Distance Sensor • Triangulation • Wheel and Encoder • Sleeve • Push Arm • Magnetometer
Specific Designs • Laser Distance Sensor • Triangulation • Wheel and Encoder • Sleeve • Push Arm • Magnetometer
Specific Designs • LiDAR • Triangulation • Wheel and Encoder • Sleeve • Push Arm • Magnetometer
Outline • Project Summary • Block Diagram • System Overview • Design Requirements • System Specifications • Preliminary Work • Team Schedule • Design Process • Schedule
Schedule • Phase 1 - Project Definition • Phase 2 - Design Phase/Research Application • Phase 3 - Advanced Analysis/Prototyping • Phase 4 - Project Delivery
Schedule • Phase 1 - Project Definition • August – Mid October • Phase 2 - Design Phase/Research Application • Phase 3 - Advanced Analysis/Prototyping • Phase 4 - Project Delivery
Schedule • Phase 1 - Project Definition • Phase 2 - Design Phase/Research Application • Mid October – January • Top Three Ideas to CAT • Agree on Top Solution • Phase 3 - Advanced Analysis/Prototyping • Phase 4 - Project Delivery
Schedule • Phase 1 - Project Definition • Phase 2 - Design Phase/Research Application • Phase 3 - Advanced Analysis/Prototyping • January – April • Prototyping (Client Approved) • Phase 4 - Project Delivery
Schedule • Phase 1 - Project Definition • Phase 2 - Design Phase/Research Application • Phase 3 - Advanced Analysis/Prototyping • Phase 4 - Project Delivery • April – May • Final Report • Final Presentation
M E Group: Andrew Aubry Chris Costello Ken Ratekin Advisors: Dr. Morris Dr. Sanchez Nick Schmidt E E Group: Phillip Latka Leann Vernon Buisness: Nicole Itschner Scott Roth Kinzie Sellers Rose Wurster