200 likes | 356 Views
ALICE RF System Andy Moss & Alan Wheelhouse, ASTeC, Daresbury Laboratory. RF System. Main Menu RF Operation Switching on the IOTs RF Control Monitoring Systems IOTs Linac & Booster Cavities Buncher Cavity Pressure Monitoring. Main Menu. RF Drop Down Menu RF Buncher RF Booster 1
E N D
ALICE RF SystemAndy Moss & Alan Wheelhouse,ASTeC, Daresbury Laboratory ALICE RF System Andy Moss/Alan Wheelhouse
RF System • Main Menu • RF Operation • Switching on the IOTs • RF Control • Monitoring Systems • IOTs • Linac & Booster Cavities • Buncher Cavity • Pressure Monitoring ALICE RF System Andy Moss/Alan Wheelhouse
Main Menu RF Drop Down Menu • RF Buncher • RF Booster 1 • RF Booster 2 • RF Linac 1 • RF Linac 2 • RF PSU • Linac Module • Booster Module • RF Buncher • Adhoc RF Gain • Tuner Motor Test ALICE RF System Andy Moss/Alan Wheelhouse
RF Operation ALICE RF System Andy Moss/Alan Wheelhouse
RF PSU Control • Analogue Monitoring • Control Area • IOT Monitoring Main Menu → RF → RF PSU ALICE RF System Andy Moss/Alan Wheelhouse
Switching On The IOTs • Press (Hold down) • Aux ON • SB ON • Filaments need 10 minutes • Check ion current is <1µA • HV ON • HV will slowly rise to 27kV, ~600mA • Check ion current is <1µA • Allow 10 minutes for the quiescent currents to stabilise • Switch RF ON ALICE RF System Andy Moss/Alan Wheelhouse
RF On • Trace seen on oscilloscope • RF raised on each IOT to provide the required gradient for each of the Linac and Booster cavities • Check ion current is <1µA • Ditto for the solid state amplifier on the Buncher cavity ALICE RF System Andy Moss/Alan Wheelhouse
RF Control – Linac & Booster Cavities Main Menu → RF → RF Linac 1 • RF power adjusted using the gradient • RF phase adjustment (station phase) • All other controls are fixed ALICE RF System Andy Moss/Alan Wheelhouse
RF Control – Buncher Cavity Main Menu → RF → RF Buncher • RF power adjusted using the gradient • RF phase (station phase) • All other controls are fixed ALICE RF System Andy Moss/Alan Wheelhouse
Operation • Quench • RF should switch off • If not immediately switch off rf press HV ON • Trips • Re-apply • Constant trips seek assistance • IOT arc detector trips need to be reset at the PLC • An additional screen will be added in the future ALICE RF System Andy Moss/Alan Wheelhouse
Monitoring Systems ALICE RF System Andy Moss/Alan Wheelhouse
IOT Readings • All IOT limits are set within the PLC • Power measurements • Drive • Output • Additional voltage readings Main Menu → RF → RF PSU → LC IOT5 ALICE RF System Andy Moss/Alan Wheelhouse
Booster & Linac Readings • Power Measurements • Waveguide power • Cavity probe power Main Menu → RF → RF PSU → Linac ALICE RF System Andy Moss/Alan Wheelhouse
Buncher Readings Main Menu → RF → RF PSU → Buncher ALICE RF System Andy Moss/Alan Wheelhouse
Calibration Readings • Calibration readings for all the power measurements • DO NOT TOUCH Main Menu → RF → Adhoc RF Gain ALICE RF System Andy Moss/Alan Wheelhouse
SC Module Monitoring • Monitoring for Booster and Linac Cavities • Cavity power and gradient • Waveguide powers • Cavity pressure • Cold & warm window temperatures Main Menu → RF → Linac Module ALICE RF System Andy Moss/Alan Wheelhouse
Machine Vacuum Monitoring Main Menu → Machine → Vacuum ALICE RF System Andy Moss/Alan Wheelhouse
Injector Vacuum Monitoring Main Menu → Injector → Vacuum ALICE RF System Andy Moss/Alan Wheelhouse
Monitoring Main Menu → General → Monitoring • Radiation monitoring • Pressure monitoring ALICE RF System Andy Moss/Alan Wheelhouse
Monitoring - Graphs Main Menu → Injector → Injector Vacuum → Log Pressure 1hr ALICE RF System Andy Moss/Alan Wheelhouse