Program Executive Office Command, Control, Communications, Computers and Intelligence (PEO C4I) Consolidated Afloat Net

Program Executive Office Command, Control, Communications, Computers and Intelligence (PEO C4I) Consolidated Afloat Networks and Enterprise Services (CANES). 19 October 2011 CAPT D.A. LeGoff Program Manager (PMW 160) 619.524.7909 didier.a.legoff1@navy.mil.

mantreh
Download Presentation

Program Executive Office Command, Control, Communications, Computers and Intelligence (PEO C4I) Consolidated Afloat Net

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Program Executive Office Command, Control, Communications, Computers and Intelligence (PEO C4I) Consolidated Afloat Networks and Enterprise Services (CANES) 19 October 2011 CAPT D.A. LeGoff Program Manager (PMW 160) 619.524.7909 didier.a.legoff1@navy.mil Statement A: Approved for public release; distribution is unlimited (13 OCTOBER 2011)

  2. Transitioning the Environment • CANES • Common Computing and Software Environment; Virtualization • Cross Domain Solutions (CDS) • Systems Management • Technology Refresh • Status Quo • Multiple security vulnerabilities • Multiple unique networks & h/w variants • Multiple Operating Systems and versions • Multiple protocols and legacy interfaces • Inefficient use of server/storage resources Across multiple security enclaves Software Hardware Common Computing Environment

  3. CANES Overview • Total Ownership Cost and Operational Relevance • Constant competition • Open architecture • Government owned data rights • Obsolescence and technology refresh • CANES replaces existing shipboard network systems (ISNS, SCI Networks, CENTRIXS-M, SubLAN, VIXS) • CANES requirements derived from these programs • Mission Critical, MAC-1 derived from hosted applications • CANES replaces Legacy networks at a 4:1 ratio

  4. CANES Program Summary Schedule

  5. CANES Acquisition / Contracting Next Steps

  6. Full Deployment Roles and Responsibilities System Engineering (SE) Phases Capability Need Determination Design Build, Integrate, and Test Produce, Install, and Sustain Ship Install AI Integration, Installation, and Sustainment IMO AIT System Validation (e.g. OA, IOT&E) Engineering Baseline (EBL) System Production & EOL Replacements Functional Baseline (FBL) System Verification (e.g. CSIT) • System-Wide Functional Specification • Completed System Configuration • Technical Data Package Allocated Baseline (ABL) Subsystem Integration and Verification • Subsystem/Item Specifications (e.g. Rack Specifications, Storage Unit Specifications, Software Package Specifications) • Completed Subsystem / Item Configuration • Technical Data Package Component Build and Integration • Completed Product Selection and Configuration Design Baseline (DBL) • Component-Level Specification • Detailed Design Alteration Installation Team (AIT) SE/AI Engineers (TDA) ESS Contractor (CDA) Production Contractor

  7. Managing ACAT I Program in Current Fiscal Environment • Impacts of current fiscal Reality • CANES incurred ~5 month schedule delay due to FY11 Continuing Resolution (CR) • 10+ platforms unfunded over FYDP due to FY11 CR and Congressional Marks • ALT POM13 reduced program by $120.1M • FY12 CRA Legislative Anomalies language submitted to execute program under FY12 CR • Program Manager Priorities • Better Buying Power Initiatives • Target Affordability – increased cost discipline • Incentivize Productivity • Promote Competition • Reduce Bureaucracy

  8. Summary Revised program plan minimizes impacts, ensures technical maturity and maintains acquisition strategy Acquisition milestones still achievable within approved parameters and first CANES installation on DDG platform planned for late FY12 CANES program still committed to maximize competition throughout program’s lifecycle – two separate full and open competitions for Full Deployment (FD) CANES FD contracting strategy involves many moving parts – OCI concerns More details to be provided at CANES Industry Day; planned June 2012

  9. We get IT. We also integrate it, install it and support it. For today and tomorrow. Visit us at www.peoc4i.navy.mil