1 / 11

RPC Data Certification

RPC Data Certification. M. Maggi INFN Bari. Goals. RPC system should provide understood Data and Performance to get any CMS result I nterface the RPC with Physics Validation Team (PVT) flagging each DataSet of Data and MonteCarlo processing. The overall view. P5. T0. T0 Reco.

marah-weiss
Download Presentation

RPC Data Certification

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RPC Data Certification M. Maggi INFN Bari

  2. Goals • RPC system should provide understood Data and Performance to get any CMS result • Interface the RPC with Physics Validation Team (PVT) flagging each DataSet of Data and MonteCarlo processing

  3. The overall view P5 T0 T0 Reco To Be Certified Online Stream StreamExpress Primary Dataset DQM Online Prompt DQM Offline DQM Offline CMS RUN Registry PVT RPC Certification

  4. The DQM RR

  5. The DQM role (Anna Cimmino) • Used by Central Shifter • Provide a clear set of Histogram coping with each individual case: • Deal with HV bit • Deal with Statistics • Appropriate use of Noise and Signal • Used by RPC Shifter • Provide more deeper insight to potential problem. RPC needs WBM tools for Online Diagnostic

  6. The DQM Framework • P5 Online System. Code must be performing and synthetic… • Offline T0 for Stream and Reco. Code must be robust Not everything can go to DQM system! but can use DQM style

  7. Automatic Certification • DQM Shifter Based • Learning phase, with have still to get a coherent picture Last Re-Reco May27 with CMSSW 361p3 BAD in StreamExpress, GOOD in May27 132471 132473 132474 132477 132478 BAD in May27, GOOD in StreamExpress 132572 132648 132959 132960 132961 133036 133081 133242 136080 136087 136097

  8. The Release Validation Role (JungHwanGoh) • The RPC Software is Degradable • CMS Framework Changes • Connections to DB • OS and Compiler upgrades • Stricter Coding rules For Each Release Set of Standard DQM-like Plots in different areas: Geometry/SimHit/Digis/LocalReco/…. /DQM?

  9. Certification Offline DQM Prompt Analyses Online DQM twiki:RPCModulesTasks RR ELogs Occupancy++ SegmentExtrapolation++ Noise++ Emulator On Noise Trigger++ Non Event Data Analysis++ RPC use on Muons Atypical Cluster …. MC & Data Processed with A given Release WBM FULLY VALIDATED RPC SW

  10. Conclusion • Certification is a task that needs Diagnostic Tools DQM,WBM • There is a clear interplay among SW Validation, DQM, and Prompt Analysis • There is a continuous Data Processing

  11. Open Issues • WBM needs to be finalized and we need to clarify the use for Certification • DQM needs consolidation for muon based quantities • Prompt Analysis requires a redesign…. (DQM/CAF, CRAB based, ….)

More Related