Innovation. The purpose of the program is to use the fluctuations in the Earth and convert it to the Electric Energy. Our technology will be capable to supply constantly electric energy, with limited cost of maintenance. No pollution No costly maintenance No costly initial setup.
E N D
Innovation • The purpose of the program is to use the fluctuations in the Earth and convert it to the Electric Energy. • Our technology will be capable to supply constantly electric energy, with limited cost of maintenance. • No pollution • No costly maintenance • No costly initial setup Confidential, Do Not Distribute
Description of the Technology We estimate : 10m² = 1KWatt Our technology is allowing us to use a very small space and still reach to large amount of MWatt The shell of the earth is rapidly fluctuate (microns) There are the materials that when you press on them, potential difference is created, like quartz or composite. With our technology we can convert these fluctuations into the electric energy. Confidential, Do Not Distribute
Why We? Photo – Voltaic ROI is 6-10 years. After 7 years you have to reinstall most of the silicon cells. Amount of sun hours is limited. Cost of the installation is 1.5-2.5 million Euro for 1MgW/h. Our Technology • Don’t have to reinstall any parts. • Amount of work hours is 24/7. • Cost of the installation up to 1.5M Euro for 1MgW/h.(depends on structure and cost of the land) • ROI is SMALLER – up to 3 years. Confidential, Do Not Distribute
Advantages Our technology contributes to improving the security of Europe's energy supply Confidential, Do Not Distribute
Program is in 4 Phases • Phase 1 – producing scheme – 1000 watt • Phase 2 – pilot version 100 Kwatt. • Phase 3 – production 1MgW. • Phase 4 – production 5-100 MgW. Confidential, Do Not Distribute Confidential, Do Not Distribute
Phase 1 • Development of a laboratory prototype , producing and storing energy: 1, 10, 100, 1000 WATTS. • Objective – Developing a basic scheme and producing and storing electric energy. • Time : 1-2 years • Personal : 7 people. • Money needed : 1.5-3 Million Euros. Confidential, Do Not Distribute
Phase 1 - Steps • Building laboratory, hiring people • Selecting the source of oscillations - electrical, mechanical, hydraulic, magnetic ... • Selection of the principle of converting vibration - piezo, magnetic, ... • Selecting the connection method of the system • Selecting the method of accumulation of finished energy (batteries, dry cells and so on) • Selecting materials for energy conversion, for example : natural (quartz), artificial (composite) • Choosing the materials for energy transfer: metal, semiconductor,… Confidential, Do Not Distribute
Phase 1 – Steps • Development of a test design product for testing schemes (schemes). • Selecting devices • Choosing accessories • Making drawings • Manufacturing, assembly and choosing stand • Testing. Objective - to check the various circuit elements and their interaction. • Finalization of the scheme for pilot. Confidential, Do Not Distribute
Phase 2 • Development of pilot plants for electric energy storage and production: 10 - 100 kWatts. • Objective – Developing a pilot version and producing and storing electric energy. • Time: Up to 1-2.5 years. • Personal: 8 • Money needed: 1.5-3.5 Million Euros. Confidential, Do Not Distribute
Phase 2 – Steps • Selecting the location : • Collection of geophysical and geo-mechanical data. • Collection of archaeological data. • Development of the design of the construction. • Selection of the technological scheme. • Selection of the control circuit. • Selection of the basic equipment. • Selection of the accessories. • Selection of the devices. • Creation of the drawings. Confidential, Do Not Distribute
Phase 2 – Steps • Production Setup • Manufacturing the parts of the installation. • Building the installation, including the adaptation. • Conducting pilot tests. • Objective – collection the data for development of a pilot plant for energy storage and production : 1 - 100 MgW. Confidential, Do Not Distribute
Phase 3 – Production • Production of 1 MgWatt Phase 4 – Production • Production of 5-100 MgWatt Confidential, Do Not Distribute Confidential, Do Not Distribute
Status of the Project • Ready - Theoretical Model of working system (Algorithms, Mathematics, Formulas, Sketches) Algorithms Formulas Mathematics Sketches Confidential, Do Not Distribute
Team • Abramov Alex – Project Leader. 33 years old. Alex has an extensive knowledge in project management and company Business development. Alex now is managing director of Gazit Technologies, a start up company that sold it’s product and now acting as an outsourcing company in web development.http://www.linkedin.com/in/enigmatec • Shamuilov Boris – PhD in Physics and Chemistry. 59 years old. Boris has an extensive knowledge in R&D. Boris has 25 patents registered on him and on the group that it was developed. Confidential, Do Not Distribute
Thank you Contact us Alex Abramov Tel : +972 52 6408850 abramovalex@gmail.com Confidential, Do Not Distribute