An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Structure of charges update: consultation responses Presentation to the electricity DCMF 5 February 2009

  2. Update • Our December consultation asked for views on the next steps for the project, and whether industry is supportive of Ofgem prioritising its resources on this project • We met bilaterally with stakeholders who requested a meeting in December / January • Consultation closed 22 January • Intend to raise at the February meeting of the Authority • Through the consultation period DNOs have made progress voluntarily on common HV/LV charging arrangements for 2010 • We have been attending work stream meetings • We met with DNOs on HV/LV issues on 16 January and wrote to them on 22 January with initial thoughts on the issues raised • During the consultation period SP and SSE published an industry “briefing” paper saying work would stop on HV/LV issues if we referred the project to the CC now

  3. Consultation responses • There was some support foran immediate CC referral. A number of response advocated more time be given for the industry to resolve the matter itself • A number of responses stated a CC referral may be necessary to resolve EHV issues • Overall, consultation responses were strongly in favour of ‘banking’ HV/LV progress via a licence modification. The main benefits were perceived to be at HV/LV. • These responses generally suggested allowing the industry more time to consider EHV arrangements • Some responses said refer to CC after a period of time if the industry cannot resolve EHV issue itself • Some DNOs questioned whether an HV/LV CLM is necessary, others said it would be appropriate