An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Optimal Electricity Supply Bidding by Markov Decision Process Presentation Review By: Feng Gao, Esteban Gil, & Kory Hedman IE 513 Analysis of Stochastic Systems Professor Sarah Ryan March 28, 2005 Authors: Haili Song, Chen-Ching Liu, Jacques Lawarree, & Robert Dahlgren

  2. Outline • Summary of the previous presentation • Model Validation • Implementation and case study • Description of Examples • Summary

  3. Summary of previous presentation • Introduction • Electric Market is now Competitive • GenCos Bid on Demand • Purpose • MDP Used to Determine Optimal Bidding Strategy • Problem Formulation • Transition Probability Determined by Current State, Subsequent State, & Decision Made • 7 Variables to Define a State • Aggregation Used to Limit Dimensionality Problems • Model Overview • 7 Day Planning Horizon • Objective is to Maximize Summation of Expected Reward • Value Iteration

  4. Value Iteration Discussion • V (i, T+1): Total Expected Reward in T+1 Remaining Stages from State I • At the last stage T = 0 • Value Iteration (Backward Induction) • Ignore discount factor • The immediate reward is dependent on the initial state, following state and decision a

  5. Model Overview Clarification • Sum of all Scenarios S that result in a given spot price, cleared quantity, and production limit. • Prob to Move from State i to j given decision a = [Prob (that the spot price, production level are correct and load forecast = demand)*prob(of having the proper load forecast)] • Resulting Spot Price can be dependent on Decision a if the bidder has market power

  6. Model Validation • For model validation: • Accumulate actual data and observations from the market over a period of time (e.g. 1 year) • Market data set provides the actual scenarios • Relationship between estimated by the BIDS representation r(i,j,a) and actual rewards w(i,j,a) can be analyzed by linear regression.

  7. Case Study • 3 suppliers: GenCoA, GenCoB, and GenCoC, all bidding in the spot market • GenCoA is the decision maker using the Markov Decision Process technique • GenCoA: 1 generating unit • GenCoB: 2 generating units • GenCoC: 2 generating units • Planning Horizon: 7 days (bid decision for next day considers the entire week ahead

  8. Case Study • GenCoA makes a decision from a set of pre-specified decision options • GenCoA does not know exactly how GenCoB and GenCoC are going to bid • But their individual bidding behavior is modeled by bid prices, quantities and the associated probabilities based on GenCoA’s knowledge and information • Transition probabilities and rewards are calculated using algorithm described in previous presentation

  9. Two Basic Market Situations • EXAMPLE 1: • Decision-maker has a production limit over the planning horizon • Decision-maker does not have market power (perfect competition) • Optimal strategy is time dependent due to the production limit • In some states the optimal decision is not to sell, but to save the resources for more profitable days

  10. Two Basic Market Situations • EXAMPLE 2: • Decision-maker has market power: it can manipulate the bid to influence the spot price • Decision-maker has no production limit • Decision-maker makes the bidding decision to maximize the expected reward over the planning horizon • Daily maximum strategy is time independent: decision-maker makes the same decision as long as the system is in the same state • BIDS value iteration is time dependent: it takes into account how current biddings affect future spot prices

  11. Comparison of Two Cases • Without market power, bidder is concerned with saving resources for more expensive periods • With market power, bidder is concerned with properly influencing the future spot price to maximize profit • Knowing whether the bidder has market power or not is crucial since the relationship between spot prices and decisions would depend on each other

  12. Summary • Model Overview • 7 Day Planning Horizon • Objective is to Maximize Summation of Expected Reward • Value Iteration • Model Validation • Comparison of Predicted and Actual Results (by linear regression) • Implementation and case study • Three GenCos, GenCo A is the Decision Maker • 5 Generators among the 3 GenCos • Description of 2 Examples: • Production Limit without Market Power • Market Power without Production Limit • Next Time: Presentation and Discussion of Results and Conclusions

  13. Questions???