40 likes | 172 Views
Integrated Nutrients Pollution Control Project LN 4873 – RO WBTF 050327-RO. Government of Romania. Global Environment Facility. The World Bank. MINISTRY OF ENVIRONMENT AND CLIMATE CHANGE ROMANIA . Naiana Milea - PMU Director.
E N D
Integrated Nutrients Pollution Control ProjectLN 4873 – ROWBTF 050327-RO Government of Romania Global Environment Facility The World Bank MINISTRY OF ENVIRONMENT AND CLIMATE CHANGE ROMANIA Naiana Milea - PMU Director
a) use of analysis data provided by a ground and surface water monitoring program performed by ANAR, in the Project area, using 124 piezometers and 84 surface water sampling points; Methodology for evaluating the reduction of nutrients discharge in the Project area • b) use of proxies to estimate the reduced N & P discharge into the water bodies.
Stress reduction measurements: Pollution reduction practices
Stress reduction measurements: Agricultural pollution reduction practices Target for end of Project: 300,000 kg N/year