1 / 6

SDSM&T Bookstore Web Order Space

SDSM&T Bookstore Web Order Space. Fall Term 2011. Current Facility. Actual Use: Online order fulfillment (& everything else) Strategy/Goals: Two-three day turnaround Just-in-time order fulfillment Flexible & safe space!. Safety & Security.

maren
Download Presentation

SDSM&T Bookstore Web Order Space

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SDSM&T Bookstore Web Order Space Fall Term 2011

  2. Current Facility • Actual Use: • Online order fulfillment (& everything else) • Strategy/Goals: • Two-three day turnaround • Just-in-time order fulfillment • Flexible & safe space!

  3. Safety & Security • Personnel Safety & Personal Property Security: • Safe/more efficient way to enter/exit receiving area • Safer roof access ladder area • Enhanced lighting • Employee personal space (coats/bags) • Product & Equipment Safety: • Efficient storage for perishables/beverages (space and processing) • Equipment storage – cart, ladder, step stool, sign holder, plotter, hanger organizer • Packing material handling

  4. Efficiency & Flexibility of Use • Areas to incorporate: • Better utilization of storage space – flexibility • Island-type workstation envisioned • Equipment storage area • Centralized Audio/Visual controls for displays • Bins for smaller inventory types • Well defined outgoing mail/packages area • Reconfigurable space for: • Textbook reservation orders • Mid-August to 1st part of September • Late-December to mid-January • Short term customer order storage • Up to 7 days

  5. Building Planning • Rough floor plan is available • Verify accuracy with measurements • Google Sketch-Up 3-D model is desired as part of project deliverables • Equipment examples are available onsite • Future development recommendations are desired • Increase of 50% in customers in short term • Interactions with adjacent areas • Cost estimates / prioritization desired

  6. Contact Information • Marlin Kinzer4-2375 • Marlin.Kinzer@sdsmt.edu • Bookstore Website: • http://www.sdsmtbookstore.com

More Related