An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RHIC Heavy Ion Run-11 Status Meeting Updates

  2. Heavy Ion Run Final Update 6/24-27 • Physics running, 41stores • Tandem intensity issues • Access controls failure • Access for RF trip Outstanding items

  3. Next 48 hours 6/27-29 • Physics ends 2200 Tuesday 6/28 • APEX and Power Supply tests until 0600 Wednesday 6/29

  4. Heavy Ion Run Update 6/22-6/24 • Physics running, 28 stores • No failed ramps • 4 aborted stores • ODH HW failure • Node card failure • Abort kicker trip • Power dip • Blue injection retuned • Reduced store length to 1 hour • Conducted vernier scans Outstanding items • Yellow end-ramp efficiency • Better overnight • Injection damper issues?

  5. Weekend outlook 6/24-27 • Network recovery • Continue Physics • APEX and MD next week? • Last meeting: Monday, noon

  6. Heavy Ion Run Update 6/20-6/22 • Setup started ~1730 Monday • Physics started ~1730 Tuesday • 6 stores • Injection & ramp collimation implemented • Correcting injection drift • Tandem reverted to optimal Au configuration Outstanding items • Blue injection efficiency • Yellow ramp efficiency • Injection damper issues?

  7. Next 48 hours 6/22-24 • Continue Physics • Store length? Optimal ~1 hour. • Can detectors remain on? • Status meetings M-W-F

  8. Heavy Ion Run Update 6/17-6/20 • Physics running, 12 stores • 2 failed ramps • Blue abort prefire • 1 aborted store • power dip, QLI • Tandem foil work conducted behind store Friday. • One additional store for AnDY (16081) • 200 GeV Physics ended 0800 Monday. Outstanding items • Blue injection efficiency • Storage cavity voltage calibration • Blue cavities • Requires working Blue longitudinal Schottky

  9. 27 GeV startup 6/20-22 • Starts Monday 1600 • IR access during hysteresis • Beam development follows • Re-establish injected beam • Ramp with feedback • Store setup • Status meetings M-W-F

  10. Heavy Ion Run Update 6/15-6/17 • Physics running, 6 stores • 1 failed ramp • LLRF test ramp • 1 aborted store • False BLM trip, 7W • IP2 crossing angle removed after maintenance • Corrected with feedbacks • Machine Development: 9 hours • 7 hours LLRF • Punctuated with 2 HLRF failures/accesses and Blue injection kicker failure • Second ramp needed • 2 hours AnDY collision setup Outstanding items • Tandem low on stripping foils • Blue injection efficiency • Blue transition • Landau problem again, fill 16071 • Storage cavity voltage calibration • Blue cavities • Requires working Blue longitudinal Schottky

  11. ZDC Accidental correction • Number of buckets: Blue filled bunches • STAR • ZDC Singles East, ch 1 • ZDC Singles West, ch 2 • ZDC, ch 3 Corrected=ZDC-{East*West/[(Blue-Blue/14)*78000]} • PHENIX • ZDC Singles North, ch 1.1 • ZDC Singles South, ch 1.2 • ZDC, ch 16 Corrected=ZDC-[North*South/(Blue*78000)]

  12. Final 200 GeV weekend 6/17-20 • Continue Physics • One more store with AnDY • One more set of vernier scans • One more test of β* squeeze • Tandem foil work behind store • APEX Monday 0800-1600 • √SNN = 27 GeV beam development starts Monday 1600 • Status meetings M-W-F

  13. Heavy Ion Run Update 6/13-6/15 • Physics running, 10 stores • 3 failed ramps • Yellow feedback target tunes too close? • Yellow debunching before accramp • Blue abort kicker prefire + quench • 4 aborted stores • Yo1-sxf1 trip • Yellow abort kicker prefire + quench • Wrong Chrom values left from MD • Cryo lead flow interlock • Beta squeeze, DX ramp test for AnDY work • Partially behind Booster RF failure • Some Tandem intensity issues Outstanding items • Blue injection efficiency • Storage cavity voltage calibration • Blue cavities • Requires working Blue longitudinal Schottky

  14. Next 48 hours 6/13-15 • LLRF firmware upgrade • Dump at 0900 tomorrow to begin • AnDY ZDC calibration • 2 stores following LLRF work • Continue Physics • √SNN = 27 GeV beam development next Monday • Status meetings M-W-F

  15. Heavy Ion Run Update 6/10-6/13 • Physics running, 14 stores • 2 failed ramps • Network switch failure, 11A • BBQ lock windows not set for ramp • 1 early dump • Rebucketing failure, HLRF misconfiguration after access Outstanding items • Blue longitudinal problems on ramp • Blue injection efficiency • Storage cavity voltage calibration • Blue cavities • LLRF firmware upgrade • 4 hrs, week of 6/13 • AnDY ZDC calibration

  16. 27 GeV medium energy run notes • Ramp name Au11v6 (work in progress) • 13.5 GeV beam energy • 3m β* at IP6 and IP8 • Below transition • No rebucketing • No longitudinal cooling • AP shifts start 0800 Monday 6/20

  17. Next 48 hours 6/13-15 • End of store MD: β* squeeze at IP6 • Slow ramp to try and eliminate rise in beam decay • Continue Physics • Continue fine tuning cooling for best performance. • √SNN = 27 GeV beam development next Monday • Status meetings M-W-F

  18. Heavy Ion Run Update 6/8-6/10 • Physics running, 4 stores • no failed ramps • 2 early dumps • Sextupole temperature problems in 1003B • APEX, 16 hours • Lost 4 hours to weather and related issues. Outstanding items • Blue longitudinal problems on ramp • Although, none on the last few ramps • Blue injection efficiency • Storage cavity voltage calibration • Blue cavities • LLRF firmware upgrade • 4 hrs, week of 6/13 • AnDYZDC calibration

  19. Weekend outlook 6/10-13 • Access for PHENIX RPC issues. • Continue Physics • Continue fine tuning cooling for best performance. • NOTE plan to run at √SNN = 27 GeV • Status meetings M-W-F

  20. Heavy Ion Run Update 6/6-6/8 • Physics running, 9 stores • 1 failed ramp • Early ramp loss, LLRF problem • 2 aborted stores • Yellow abort kicker • Yellow RF permit failure • Machine development • Beta* squeeze test, “MAD-X knob” • Some complications to measured results, will try again Outstanding items • Blue longitudinal problems on ramp • Blue injection efficiency • Storage cavity voltage calibration • Blue cavities • LLRF firmware upgrade • 4 hrs, week of 6/13

  21. Cooling on vs. off

  22. Next 48 hours 6/6-8 • Continue Physics • Continue fine tuning cooling for best performance. • Test β* squeeze at end of store. • APEX Thursday • Note NSRL/Tandem Si beam conflict • Status meetings M-W-F

  23. Heavy Ion Run Update 6/3-6/6 • Physics running, 14 stores • 3 failed ramps • Sextupole trip late in ramp • Early Blue loss, RF or node card? • 1 aborted store, QD problem • Landau cavity issues at transition • Machine development • Beta* squeeze test, “MAD-X knob” Outstanding items • Blue injection efficiency • Storage cavity voltage calibration • Blue cavities • LLRF firmware upgrade • 4 hrs, week of 6/13 • Stochastic cooling issues • BL kicker drive

  24. Next 48 hours 6/6-8 • Continue Physics • Continue fine tuning cooling for best performance. • APEX Wednesday • Note NSRL/Tandem Si beam conflict • Status meetings M-W-F

  25. Heavy Ion Run Update 5/27-6/1 • Maintenance, vacuum pump down complete Thursday 0330. • STAR, PHENIX polarity reversal • Physics running, 5 stores • 1 early dump • Low rates, Blue vacuum • 3 aborted stores • Yellow quench after rebucketing, YS5 cavity problem • Yellow abort late in store, related to activate? • Cryo lead flow • Machine development • Beta* squeeze test, all planes both IRs • Working point scan • Yellow RF cavity voltage calibration Outstanding items • Blue injection efficiency • Storage cavity voltage calibration • Blue cavities • LLRF firmware upgrade • 4 hrs, week of 6/13 • Stochastic cooling issues • BL kicker drive repair • BV not yet operational

  26. New RF voltage calibrations

  27. Run-10 Yellow working point Present Yellow working point

  28. Weekend outlook 6/3-6 • Restore stochastic cooling systems • Requires additional access • PHENIX access concurrently • Continue Physics • Vernier scans Friday: early in store • Status meetings M-W-F

  29. Heavy Ion Run Update 5/27-6/1 • Physics running, 19 stores • 5 failed ramps • Early loss attributed to y-qtrim? • Yellow RF trip on ramp • Fast Blue loss ~10 sec after γt (2x) • Unexplained fast Blue loss late in ramp • 5 aborted stores • PASS failure • Blue abort kicker • STAR magnet ramping/chiller problems • Early dump, YS3 trip/bad rebucketing • QLI at dump, Yellow debunched beam • 1 extended store • Insufficient Tandem beam • Some YL cooling issues, off for last 3 stores Outstanding items • Yellow, Blue store conditions • Blue injection efficiency • Storage cavity voltage calibration • 1 test ramp • BV cooling pickup • Maintenance day item • LLRF firmware upgrade • 4 hrs, week of 6/13 • AGS ag17-qgt magnet failure • Deferred to shutdown

  30. Next 48 hours 6/1-3 • Complete maintenance • BV cooling pickup • YL cooling kicker motion control • YS2, YS3 RF • Yellow collimator pindiodes • Resume Physics • STAR, PHENIX polarity switches • Vernier scans Thursday or Friday: early in store • Machine Development Thursday: • End of store: test beta* squeeze, 2 IRs 4 planes • Starts between daytime stores • Store conditions • Working point scans (dedicated ramp) • Storage voltage calibration • Status meetings M-W-F

  31. Heavy Ion Run Update 5/23-25 • APEX completed Wednesday • Attempt at fixing post-γt ramp loss • Physics running, 4 stores • 3 failed ramps • Early loss attributed to y-qtrim? • FEC reboot and subsequent steering error • Fast loss ~10 sec after γt • 1 aborted store • Unexplained permit drop 6a to 7a • AGS vacuum failure+Blue injection kicker • Other work completed concurrently • Machine Development deferred • Some YV cooling issues(limit switch fixed) Outstanding items • AGS ag17-qgt magnet failure • Long maintenance day or shutdown repair • Yellow, Blue store conditions • Blue injection efficiency • Storage cavity voltage calibration • 1 test ramp • BV cooling pickup • Maintenance day item • LLRF firmware upgrade • 4 hrs, week of 6/13

  32. Holiday weekend 5/27-31 • Continue Physics • Machine Development items: • Store conditions • Working point scans (dedicated ramp) • Yellow negative chromaticity? Blue? • Beta* squeeze – prepare for automation. • More beam • Ramp Efficiency • Ramp quicker after fill • Status meetings M-W-F • Run Coordinator will be off-island but on cell... • AP shifts: on call • ...but be prepared to log in remotely or come in if necessary.

  33. Heavy Ion Run Update 5/23-25 • Physics running, 7 stores • No aborted stores (2 early dumps, 1 late dump). • 5 failed ramps • Sextupole ramp rate (2x) • Post-transition loss (3x) • Accesses for repairs: YA1 cavity, stochastic cooling amplifiers, sextupole feedthrough ground current, collimator pin diodes… • QD controls problems (2x) • 3rd test of beta squeeze at store • 4 planes successfully squeezed at once • Requires more beam time to measure optics, interpret resulting rate changes. • Vernier scans conducted • Outstanding items • Blue, Yellow store conditions • MD Thursday • Storage cavity voltage calibration • Requires test ramp • Blue injection efficiency • Fine tuning • Offline evaluation • AGS: ag17-qgt, tune quad • ATR synchro errors • BV cooling pickup • Open vacuum to repair • LLRF firmware upgrade • 4 hrs week of 6/13