Challenges, Issues, and Future Direction of the SAAC

Challenges, Issues, and Future Direction of the SAAC. Michael Schilmoeller Thursday , December 2, 2010 SAAC. Possible Topics. New risk metric(s): per kWh cost and risk metric Use and abuse of the efficient frontier Minimum loading and start-up cost representation

marge
Download Presentation

Challenges, Issues, and Future Direction of the SAAC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Challenges, Issues, andFuture Direction of the SAAC Michael Schilmoeller Thursday, December 2, 2010 SAAC

  2. Possible Topics • New risk metric(s): per kWh cost and risk metric • Use and abuse of the efficient frontier • Minimum loading and start-up cost representation • Loss of load and expected unserved energy metrics • Transmission representation • The nature of the risky futures • Modeling carbon penalties, cap and trade, emission trading credits, and all that

  3. Possible Topics • More on resource representations (hydrogeneration, conservation, wind, etc.) • Foresight assumptions and decision criteria • Economics as the basis for resource selection: what does it capture, what does it miss? • Validation and the development of futures • Conservation performance uncertainty

  4. Possible Topics • Computer applications for preparing data, recording simulation details, and analyzing results • Representation of decision uncertainty (construction cost uncertainty, construction phases, retirements) • Use of decision uncertainty representation to value modularity, capital intensiveness, and lead time for projects

  5. Committee • Concerns, questions, and interests: a roundtable • Next steps, next meetings • Volunteers for presentations