1 / 10

Andrea Chierici Alessandro Italiano INFN-CNAF 5 th DataGrid Conference

Testbed Status at INFN. Andrea Chierici Alessandro Italiano INFN-CNAF 5 th DataGrid Conference Budapest 1-5 September 2002. Hardware Resources at CNAF (1). 16 workstations: 11 dell Poweredge rack mount. 1U with dual P3 800Mhz 3 IBM X330 rack mount. 1U with dual P3 1400Mhz

margit
Download Presentation

Andrea Chierici Alessandro Italiano INFN-CNAF 5 th DataGrid Conference

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Testbed Status at INFN Andrea Chierici Alessandro Italiano INFN-CNAF 5thDataGrid Conference Budapest 1-5 September 2002

  2. Hardware Resources at CNAF (1) • 16 workstations: • 11 dell Poweredge rack mount. 1U with dual P3 800Mhz • 3 IBM X330 rack mount. 1U with dual P3 1400Mhz • 2 standard workstations • 1 Disk Server IBM with 300Gbyte available • Gigabit connection for the main services: • SE, UI, RB, RC • Fast Ethernet connection for the rest: • CE, WN

  3. Hardware Resources at CNAF (2) • Network Connectivity granted by: • Cisco 6005 for Gigabit Ethernet • Cabletron 2000 for Fast Ethernet • UPS power to grant 24/7 service • Access to GARR network = 1Gbps

  4. CNAF: present situation • All the machines were upgraded to edg-release 1.2.0: • Main services OK • Still running an RB with 1.1.4 to grant service for INFN-GRID testbeds (upgrade in progress) • Job manager used: OpenPBS 2.3 • 4 queues configured: infinite, long, medium, short • LCFG installation: • Network installation via PXE/GRUB (CNAF solution) • LCFGng under test (migration soon available)

  5. CNAF testbed layout

  6. Different Testbeds Running at CNAF • CNAF is running 2 testbeds: one for validation and one for development. • Validation testbed: • RB/II, UI, SE, (with Gigabit connections), CE, 4 WN • Development testbed (v.1.2.0): • RB/II, UI, CE, SE, 1 WN (with FE connections)

  7. CNAF Activities • Participation to development testbed activity for release 1.2: • Within Integration Team • Support activities for production testbed: • Mainly for CMS, ALICE • Demos

  8. Future Plans at CNAF • LCG production Testbed in progress • gigabit connection for all the machines • migrate to the new version of LCFG • migrate to RH7.2 where required (by applications)

  9. Contact Persons at CNAF • 3 site managers working on CNAF Testbed: • Alessandro Cavalli • Alessandro Italiano • Andrea Chierici • email address: • sitemanager@cnaf.infn.it • support granted almost all time of the year

  10. The INFN Testbed In addiction to CNAF site the INFN Testbed consists of • Some sites where the complete set of grid elements (UI, SE, CE and WNs) have been installed and configured (EDG 1.1.4). Some of them (the red ones) joined the EDG Testbed: • Catania • Legnaro • Milano • Padova • Pisa • Torino • many other sites with a subset of the grid elements: • Bari, Bologna, Cagliari, Ferrara, Genova, Lecce, Napoli, Parma, Pavia, Roma1, Roma3, Trieste The grid elements are going to be upgraded to EDG 1.2.1