An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Mechanical Integration Ken Fouts kfouts@slac.stanford.edu

  2. Key I&T Requirement Documents Requirements Definition Key to Successful I&T

  3. I&T Process Procedures Document Detailed Procedures for use in I&T

  4. Roadmap to ACD Integration and Test Install Flight PDU LAT-DS-02563 Install EM GASU LAT-DS-02563 Safe to Mate Flight Cables for PDU/GASU/ACD LAT-PS-07575 Bond Downspout Heatpipes and Fitcheck X-LAT Plate LAT-PS-04911 Complete Grid Thermal Control Installation LAT-DS-01580 Install Instrumentation Accels and TC’s LAT-DS-02563 16 Tower CPT w/ACD ACD Integration LAT-PS-07240 16 Tower LAT Optical Survey LAT-MD-00895 16 Tower CPT Critical steps have been identified and are in the current I&T plan

  5. MGSE • LAT-DS-6958 ACD Lift Fixture • Fit-check complete with ACD simulator • Proof tested per LAT I&T AIDS #1588 LAT I&T ACD lift fixture fabrication and check-out complete.

  6. ACD Lift Fixture

  7. ACD Lift Fixture w/ ACD

  8. ACD Integration Procedure (1 of 2)

  9. ACD Integration Procedure (2 of 2)

  10. Hardware Summary Hardware is in-place to support the current plan

  11. Risks Risks have been anticipated and plans put in place to mitigate them

  12. Summary • Current plan is to maintain two shift operation. • Utilize weekends maintain schedule. • Procedures, Drawings, MGSE and Flight Hardware in place to support current Phase 0 plan. • Additional subsystem personnel have been identified to support LAT I&T Operations. LAT I&T is ready to proceed with ACD integration