Groundwater Modeling Assignment #2

Groundwater Modeling Assignment #2. Description. Well pumping an unconfined aquifer at 18,000 m 3 /day. Will pumping “ significantly reduce ” the discharge to the wetland at south? Grid = 40 Rows, 18 Columns Grid cells = 250 m x 250 m All cells are 40 m thick. N-S Cross-Section View.

marion
Download Presentation

Groundwater Modeling Assignment #2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Groundwater Modeling Assignment #2

  2. Description • Well pumping an unconfined aquifer at 18,000 m3/day. • Will pumping “significantly reduce” the discharge to the wetland at south? • Grid = 40 Rows, 18 Columns • Grid cells = 250 m x 250 m • All cells are 40 m thick N-S Cross-Section View Plan View

  3. Create a New Model • Start the GV program • Select File --> New • Enter basic information about the model • # rows = 40 # cols = 18 • Row spacing = 250 m • Column spacing = 250 m • Top of Layer 1 = 1020 m • Bottom of Layer 1 = 980 m

  4. Model Grid 1020 m • Layer 1 • Kh= 50 m/day • Kv= 50 m/day • Pumping • 18,000 m3/day • Recharge • 0.001 m/day 980 m

  5. River Boundary Conditions • Select  Layer 1 • Select BCs  River • Select BCs  Insert  Window • Select  Row 1, Column 1 - 18 River Boundary Cells Note

  6. Add Constant Head Boundary Conditions • Select: BCs  Constant Head Boundary • Select: BCs  Insert  Window • Select: Row 40, Column 1 - 18 • Set value to • Boundary Head = 1000 m Constant Head Boundary Cell

  7. Edit Database – Recharge • Select: Properties  Recharge • Select: Property Values  Database • Set up 1 zone: Recharge = 0.001 m/day • Click OK

  8. Assign Recharge Values to Layers • Select: Props  Recharge • Select: Props  Set Value or Zone  Window • Start in upper right-hand corner and drag to select all cells in grid • Click OK • Select: Zone Number 1 • Click OK

  9. Create MODFLOW Dataset • Select: Model  MODFLOW  Packages • Change: Root File • Select: OK

  10. Create MODFLOW Dataset • Select: Model  MODFLOW  Package Options • Select: Length Units = meters • OK

  11. Create MODFLOW Dataset • Select: Model  MODFLOW  Package Options • Select: Tab  Initial Heads • Enter: 1000 ft • Select: OK

  12. Create MODFLOW Dataset • Select: Model  MODFLOW  Package Options • Select: Tab  BCF-LPF • Select: Layer 1 as “UnConfined” • Select: OK

  13. Create MODFLOW Dataset • Select: Model  MODFLOW  Package Options • Select: Tab  Recharge - ET • Select: Top Layer • Select: OK

  14. Create Working Directory • Select: Model  Paths to Models • Select: C:\your_directory\work

  15. Run Simulation • Select: Calculator button • Would you like to process the results? Select: Yes • Select: Cell-by-cell flows • Select: Contour Water Table in Layer 1