SUSTAINABLE TERRITORIAL DEVELOPMENT IN NORTH-WEST EUROPE

SUSTAINABLE TERRITORIAL DEVELOPMENT IN NORTH-WEST EUROPE Committed funds following the two first calls and projects expected for PSC 3 & 4. Towards long-term transnational co-operation. Approved Projects in 2002. PRIORITY ONE:

marion
Download Presentation

SUSTAINABLE TERRITORIAL DEVELOPMENT IN NORTH-WEST EUROPE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SUSTAINABLE TERRITORIAL DEVELOPMENT IN NORTH-WEST EUROPE Committed funds following the two first calls and projects expected for PSC 3 & 4 Towards long-term transnational co-operation

  2. Approved Projects in 2002 PRIORITY ONE: SAUL: more attractive metropolitan areas in the global and European context (measure 1.1) ReUrba II: more attractive metropolitan areas in the global and European context (Measure 1.1) PRIORITY TWO: LIRA-II: sustainable Mobility Management (measure 2.1) Hospital Co-operation: improved access to the Information Society (measure 2.2) TESIS: improved access to the Information Society (measure 2.2)

  3. Approved Projects in 2002 PRIORITY THREE: SCALDIT: land use and water systems (measure 3.1) AMEWAM: land use and water systems (measure 3.1) CFM: the prevention of flood damage (measure 3.2) FOWARA: the prevention of flood damage (measure 3.2) FAR: the prevention of flood damage (measure 3.2) JAF: the prevention of flood damage (measure 3.2) PRIORITY FOUR: SOS II: protection and creative enhancement of the cultural heritage (measure 4.2) PRIORITY FIVE: SAIL II: facilitating co-operation across and between maritime and inland regions (measure 5.2)

  4. Projects expected for PSC 3 and 4 PRIORITY ONE (18) Approved SUSCIT Brownfield Development (REVIT) 2 Europolis Artery H&TT Minewater PULSE Brain Drain - Brain Gain Water in the City NENSI New Town Network 0 CROBUS PARK European Green Villages Anneau Poly-Métropolitain MOCO Community Growth Polymap DEMETER

  5. Projects expected for PSC 3 and 4 PRIORITY TWO (15) Approved NETA Nantes-Budapest LOCOFRET SATURN Pro-Holz Rives Celtes HST Integration RAPIT 2 Nantes-Budapest Dover Rail Ferry Link ENCOURAGER HST freight cargo Westra Airport Tourism InterPortPromoteNet 2

  6. Projects expected for PSC3 and 4 PRIORITY THREE (13) Approved Blue Links Inland Waterways 2 Rhinenet MOSEL WRL SAVER (former ARC) SDF River Main Freude am Fluss 4 Plateforme Intermodale Instruments to reduce flood damage Nature oriented flood protection Flood areas/ Flood risk mapping

  7. Projects expected for PSC 3 and 4 PRIORITY FOUR (20) Approved DPD ESPACE Land Links BERISP Regions of sustainable energy City Parks 0 Rivers in the city Via Romana Threatened Forest Landscapes Pro Vélo Estuary based infrastructure BPN ERIH II CRI Holding the fort Planarch II Cultural Territory Low Country Canal de Roubaix 1 European Garden Heritage Geoparks

  8. Projects expected for PSC 3 and 4 PRIORITY FIVE (2) Approved MAYA II 0 CYCLEAU 1

  9. Underdeveloped Themes and Issues • Measure 2.2 Improved Access to the Information Society • Transnational e-commerce • Training and online resource centres for SMEs • Stimulate demand for, and awareness of, ICT investment opportunities • Use of ICT to promote and facilitate multimodal transport • Any type of IT-based networks, services and applications with territorial relevance, e.g. e-dwellings, e-working etc • Improving knowledge base and efficiency of ICT related public policies

  10. Underdeveloped Themes and Issues • Priority 3: Water resources and the prevention of flood damage • Given the EU wide urgency to address flood prevention issues, the Programme is looking for high quality projects dealing with water resources and flooding (Measure 3.2) • If there is enough evidence of good transnational projects then this might trigger discussions for a shift of monies from one Measure to the other (JTS, MS, EC).

  11. Underdeveloped Themes and Issues • Priority 5: Promoting territorial integration across seas of NWE • Identifying complementary functions between NWE ports • SMEs improving co-operation in services related to seaport and inland port activities • Promotion of short sea shipping services in NWE and between NWE and other EU seaboards (Atlantic, North Sea…) • Enhancement of the indigenous maritime potential (employment, social integration) • Networks between NWE coastal gateway towns • Joint management of fishing resources, coastal ecosystems

  12. Underdeveloped Themes and Issues • All Priorities and Measures • High quality projects at all Measures are encouraged, even for those Measures where a lot of projects are on the pipeline (quantity vs quality) like 1.1, 4.2 • Meeting the targets and objectives at Programme Level means that a reorganisation of allocated money may arise at the Mid Term Evaluation even at Priority level (end 2003) • An early expression of interest will assist JTS in making a judgement about this

  13. More information to be found on: http://www.nweurope.org Thank you for your attention!