MAIN 220 Equipment Installation

MAIN 220 Equipment Installation. Chris Miller. Site Preparation. Objectives Preparing the Site Vibration and Control Anchoring Moving and Setting Leveling and Aligning Checking and Test Running. Preparing the Site. Cable / Wires / Concrete Foundation

markwalker
Download Presentation

MAIN 220 Equipment Installation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAIN 220 Equipment Installation Chris Miller

  2. Site Preparation • Objectives • Preparing the Site • Vibration and Control Anchoring • Moving and Setting • Leveling and Aligning • Checking and Test Running

  3. Preparing the Site • Cable / Wires / Concrete Foundation • Utilities and Location of Infrastructure • Barricading Work Site • Plot Plan • Frost Line FOR MORE INFO... TCP TRAINING Preparing The Site (319)

  4. Common Points of Interest • Machine Size • Machine Requirements • Electronics • Water • HVAC • Noise / human Conditions OSHA EPA • Cave Ins • Health Hazards • Hearing / Physical Risks

  5. Vibration Control and Anchoring • Vibration • Where Used • Presses • Vibro Tracks • Noise / Machine Issues • Wear • Performance Issues FOR MORE INFO... TCP Equipment Installation Lesson 2 (319)

  6. Technology • New technology being used • Benefits • Standards being adopted • Benefits • Standards specifically being ignored • Drawbacks & benefits DYA: define your acronyms!

  7. How To Control Vibrations • Isolators • Mechanical Isolators • Machine based anchors • Foundations Isolation • Air Spring Isolator • Isolator Foot • Waffle Isolator Pad

  8. Moving and Setting Procedures FOR MORE INFO... I am not sure who to see for advice here

  9. How To Control Vibrations • Isolators • Mechanical Isolators • Machine based anchors • Foundations Isolation • Air Spring Isolator • Isolator Foot • Waffle Isolator Pad

  10. Phase 2 Phase 3 Jan Feb Mar Apr May Jun July Sep Oct Nov Dec Schedule • Review high-level schedule milestones here FOR MORE INFO... List location or contact for detailed schedule (or other related documents) here

  11. Current Status • High-level overview of progress against schedule • On-track in what areas • Behind in what areas • Ahead in what areas • Unexpected delays or issues

  12. Related Documents • Marketing plan • Location or contact name/phone • Budget • Location or contact name/phone • Post mortem • Location or contact name/phone • Submit questions • Location or contact name/phone