1 / 20

Eagle River Temperature Proposal Segments 8, 9a, & 9b

Timberline Aquatics, Inc. EXHIBIT G. Eagle River Temperature Proposal Segments 8, 9a, & 9b. Eagle River Watershed. ERWSD TEMPERATURE PROPOSAL. Approach and Objectives Biologically-based site-specific standards Agreement with CPW (and other stakeholders)

marly
Download Presentation

Eagle River Temperature Proposal Segments 8, 9a, & 9b

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Timberline Aquatics, Inc. EXHIBIT G Eagle River Temperature Proposal Segments 8, 9a, & 9b

  2. Eagle River Watershed

  3. ERWSD TEMPERATURE PROPOSAL Approach and Objectives • Biologically-based site-specific standards • Agreement with CPW (and other stakeholders) • Minimize potential for degradation • Address transition zone temperatures and compliance issues • Based on findings of the UAA

  4. Eagle River Segment 8 Gore Creek above Ford Park MWAT Standards and stream temperatures (WAT)

  5. Eagle River Segment 8(Gore Creek between Black Gore Creek and the Eagle River)MWAT Standards and stream temperatures (WAT)

  6. Eagle River above Gore Creek MWAT Standards and stream temperatures (WAT)

  7. Eagle River Segment 9a(Eagle River Upstream and Downstream of the Avon WWTF)MWAT standards and stream temperatures (WAT)

  8. Eagle River below Squaw Creek (NEW Segment 9b) (Eagle River above Alkali Creek)Proposed Hybrid CS-I/CS-II MWAT Modification

  9. Eagle River below Squaw Creek (NEW Segment 9b) (Eagle River above Alkali Creek)Proposed Hybrid CS-I/CS-II DM Modification

  10. Gore Creek above Black Gore Creek

  11. Eagle River above Gore Creek

  12. Eagle River Segment 9a Transition Zone Eagle River near the confluence of Lake Creek

  13. Eagle River (NEW Segment 9b)Transition Zone Eagle River near Alkali Creek

  14. CS-I versus CS-II

  15. Fish Survey Data (1990 to 2011) in Segments 8 and 9aTrout Species Relative Abundance

  16. Eagle River Segment 8 (Gore Creek between Black Gore Creek and the Eagle River)Proposed MWAT Standard

  17. Eagle River Segment 9a (Eagle River between Gore Creek and Squaw Creek)Proposed MWAT Standard

  18. Eagle River NEW Segment 9b (Eagle River between Squaw Creek and Rube Creek)Modified CS-II MWAT Standard

  19. Eagle River NEW Segment 9b (Eagle River between Squaw Creek and Rube Creek)Modified CS-II DM Standard

  20. Eagle River Watershed

More Related