Royal Palms Parkway City Council Workshop July 29, 2014

Royal Palms Parkway City Council Workshop July 29, 2014. Scope of Work. Project Length: 2.2 Miles Roadway resurfacing with new four foot paved shoulders New Eastbound Left Turn Lane at Royal Palms Pkwy and Rickenbacker Drive – Improves safety and intersection capacity

Download Presentation

Royal Palms Parkway City Council Workshop July 29, 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Royal Palms Parkway City Council WorkshopJuly 29, 2014

  2. Scope of Work • Project Length: 2.2 Miles • Roadway resurfacing with new four foot paved shoulders • New Eastbound Left Turn Lane at Royal Palms Pkwy and Rickenbacker Drive – Improves safety and intersection capacity • New Eastbound Right Turn Lane at Royal Palms Pkwy and Belle Terre Pkwy – Improves safety and intersection capacity • Safety improvements for path to Lehigh Trail at the intersection of Royal Palms Pkwy and Rymfire Drive • Three Rectangular Rapid Flashing Beacons (RRFB) • Median Refuge

  3. Pedestrian Improvements • Royal Palms Pkwy & Rymfire Drive

  4. Map Area US 1 Belle Terre Pkwy Project Start Royal Palms Pkwy Project End

  5. Project Budget • Original Estimated Construction Budget – $900k • Proposed FY 2015 Budget - $1.33 Million • Actual Cost • Construction Bid – $1.18 million • Contingency, CEI & Misc Expenses – $150k • Total – $1.33 million