政府投资建设工程项目审批流程. 项 目 建 设 单 位. 项目单位申报材料. 发改部门 窗口收件. 发改部门统一受理此阶段所有立案资料. 发改部门发出收件回执. 收件后即送各部门. 相关部门在 5 个工作日内 发出补齐补正材料通知书. 相关部门对材料进行辅导审查. 项目建设单位补齐补正资料给相关部门. 不符合要求,各相关部门发出不予受理通知单并告知相关部门. 材料审查通过并告知相关部门. 符合要求,发改部门发 出正式立案通知给建设单位. 受理审批. 各部门按照各自权限审批.

Download Presentation

政府投资建设工程项目审批流程

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 政府投资建设工程项目审批流程 项 目 建 设 单 位 项目单位申报材料 发改部门 窗口收件 发改部门统一受理此阶段所有立案资料 发改部门发出收件回执 收件后即送各部门 相关部门在5个工作日内 发出补齐补正材料通知书 相关部门对材料进行辅导审查 项目建设单位补齐补正资料给相关部门 不符合要求,各相关部门发出不予受理通知单并告知相关部门 材料审查通过并告知相关部门 符合要求,发改部门发 出正式立案通知给建设单位 受理审批 各部门按照各自权限审批 项目单位补报经辅导补正的材料给相关部门,没有要求修正的材料不需再报。发改部门发出受理回执。 使用储备类用地或自用用地 使用非储备类用地 项目建议书审批 3个工作日 项目建议书审批 3个工作日 规划选址评审 1个工作日 规划选址 环境评价 2个工作日 用地预审 环境评价 1个工作日 可研报告审批 1个工作日 可研报告审批 1个工作日 发改部门将本阶段所有审批文件一并送达

  2. 企业投资建设工程项目审批流程 项 目 建 设 单 位 项目单位申报材料 企业服务中心或发改部门窗口收件 收件部门统一受理此阶段所有立案资料 企业服务中心或发改部门发出收件回执 收件后即送各部门 相关部门在5个工作日内 发出补齐补正材料通知书 相关部门对材料进行辅导审查 项目建设单位补齐补正资料给相关部门 不符合要求,各相关部门发出不予受理通知单并告知相关部门 材料审查通过并告知相关部门 符合要求,发改部门发 出正式立案通知给建设单位 受理审批 各部门按照各自权限审批 项目单位补报经辅导补正的材料给相关部门,没有要求修正的材料不需再报。发改部门发出受理回执。 使用储备类用地或自用用地 使用非储备类用地 项目备案 2个工作日 项目备案 4个工作日 规划选址评审 2个工作日 规划选址 或者规划设计条件 环境评价 2个工作日 用地预审 环境评价 2个工作日 企业服务中心或发改部门将本阶段所有审批文件一并送达

More Related