1 / 44

IECEE: Looking Back Living the Present Choosing the Future

IECEE: Looking Back Living the Present Choosing the Future. Pierre de RUVO IECEE Executive Secretary & COO. CAB Meeting 2013-10-22 New Delhi. Looking Back. The Genesis of the IECEE.

Download Presentation

IECEE: Looking Back Living the Present Choosing the Future

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IECEE:Looking BackLiving the Present Choosing the Future Pierre de RUVOIECEE Executive Secretary & COO CAB Meeting 2013-10-22 New Delhi

  2. Looking Back

  3. The Genesis of the IECEE The first European organization for electrical safety standards, known as Installations FragenKommission (IFK), began operating in 1926.

  4. The Genesis of the IECEE 1926 1939 1946 1985 1999 II World War IECEE CEE IFK IEC

  5. The Genesis of of the IECEE System The IECEE System, originally operated by the CEE (International (European) Commission for Conformity Certification of Electrical Equipment), was integrated into the IEC in 1985 as the CB Scheme of the IECEE. Today the IECEE System operates two Schemes, the historical CB Scheme and the CB-FCS that helps Industry to access the Global Market for Electrotechnical Equipment and Components” IEC CEE

  6. An idea has been born….

  7. Genealogy of the IECEE System

  8. Standards and ConformityAssessment Developing Standards International Standard Organization International Electrotechnical Commission International Telecommunication Union Provider of voluntary Third Party Conformity Assessment

  9. Visionary circle of Masters

  10. United……. United there is little we cannot do in a host of cooperative ventures. Divided there is little we can do.

  11. IECEE Administration till 1998 Northbrook USA Milano ITALY IECEE Secretariat Helsinky IEC C.O. Geneva

  12. Re-organisation….. • Auditing the IECEE Secretariat based in Helsinky • Diagnostic • Hiring motivate staff • Reaching a financial sound situation • Centralizing the various operation spread over the world • Developing set of Rules of Procedure and Operational Documents • Promoting the value of a Global System and its potential benefits • Developing collaboration with International Organizations • Participating as Lecturer in International events • Meeting with Industry • Meeting with Member Bodies, NCBs and CBTLs • Involving goodwill individuals to play a key role in the development • Listening the Electrotechnical World

  13. IECEE Administration from 1999 Northbrook USA Milano ITALY IECEE Secretariat Helsinky IEC C.O. Geneva

  14. One Standard, One Test, One… How some visionary bright men had the idea to establish a Mutual Recognition Agreement?What was the direct cause of the establishment of such a body?

  15. Global Trade & Conformity Assessment • Local – Regional – Global • Conformity assessment, perceived slow, steady, bureaucratic • Conformity assessment models were developed in isolation • Due to increased global trade, manufacturers identified the need to find improvements in efficiency and profitability

  16. Targets & Achievements Target: One test Achieved: One test Target: One certification Achieved: One international certification Target: One mark Achieved: One or more certification marks as needed or direct market acceptance by Regulators, Customs, Retailers, Buyers, Vendors, etc.

  17. IECEE facilitates International Trade The IECEE Schemes are intended to reduce obstacles to international trade which arise from having to meet different national certification or approval criteria.

  18. Reasons for the Success • Flexible system that can be timely responsive to the market • Type test as opposed to a full certification & follow up service • Integration of National Differences, SNCs, Regulatory requirements • Independent impartial Peer Assessment Program • Supports regulatory policies

  19. IECEE Member Bodies by Countries Korea Rep. of Libya Malaysia Mexico Netherlands New Zealand Norway Pakistan Poland Portugal Romania Russian Federation Saudi Arabia Serbia Singapore Slovakia Slovenia South Africa Spain Sweden Switzerland Thailand Turkey Ukraine United Arab Emirates United Kingdom United States Viet Nam Argentina Australia Austria Bahrain Belarus Belgium Brazil Bulgaria Canada China Colombia Croatia Czech Rep. Denmark Finland France Germany Greece Hungary India Indonesia Iran Ireland Israel Italy Japan Kazakhstan Kenya 56 Participating Countries

  20. IECEE : The Members • 56participating countries- 1 per country • 75 National Certification Bodies - 1 or more per country • 455Testing Laboratories - 1 or more per country • 2681Manufacturer’s Testing Laboratories

  21. All major stakeholders

  22. Safety – Performance - Environmental Safety IEC Standards for electrical safety Energy efficiency IEC Standards for energy efficiency Environmental Protection IECEE Hazardous Substances Program

  23. IECEE CB Scheme process Country A Process NCB TESTING IEC Std+N.D. APPLICANT NCB APPLICATION RecognizingCountries B N.D.. TEST REPORT 15 working days

  24. NCB A issuing Laboratory National differences (if applicable) National differences (if applicable) Application documents National differences (if applicable) Type test program National differences (if applicable) National differences (if applicable) National differences (if applicable) Type test program National differences (if applicable) Testing… APPLICANT CB Test Certificate CB Test Certificate CB Test Certificate CB Test Certificate Analyzing… CB Test Report CB Test Report CB Test Report CB Test Report CB Test Report Samples Vendors/Buyers Regulators Retailers 15 working days NCB B3recognizing NCB B1recognizing NCB B2recognizing CB Scheme in action

  25. Direct Acceptance by the Market Place NCB APPLICANT IECEE TEST REPORT REGULATORS BUYERS RETAILERS MARKET

  26. FACTORY Surveillance CB FCS Scheme in action Market access route ..via Recognizing NCBs FACTORY AUDIT REPORT C.A.R. CONFORMITY ASSESSMENT REPORT CBTL Kansai APPLICANT RecognizingCountries B C.A.R. CONFORMITY ASSESSMENT REPORT FACTORY AUDIT REPORT 15 working days

  27. Elements of the CB Scheme vs CB-FCS Full Certification Scheme ISO/IEC System 5 CB Scheme ISO/IEC System 1-b • Testing • Testing • Test Report – TR • Test Report – TR • Review of the Test Report • Review of the Test Report • Initial Factory Surveillance • CB Test Certificate • CB Test Certificate • Initial Factory Surveillance Report • Review of the I.F.I.R • Conformity AssessmentCertificate& Conformity Assessment Report • (Optional) NCB Certification Mark • Production is under surveillance • Factory Surveillance • Re-testing • Market control by the NCB

  28. On-Line Certificates – if not there – does not exist 28/27

  29. FACTS: Finances

  30. FACTS: Finances

  31. FACTS: Membership

  32. FACTS: MTLs Membership

  33. FACTS: CB Test Certificates

  34. FACTS: Impact of the CB Test Certificates vs Regional Schemes

  35. ACHIEVEMENTS: Governmental awareness

  36. Achievement: MoU IEC-ILAC-IAF Historical tripartite MoU with common target and goals between : IEC-ILAC-IAF

  37. + Short list of pre-selectedTechnical Assessor(s) Technical Assessor Technical Assessor Lead Assessor Lead Assessor Data Base of a Common Pool of Registered Technical Assessors ON-SITE ASSESSMENT COMMON ASSESSMENT REPORT COMMON ASSESSMENT REPORT Unified Reassessment modelExample for Testing Laboratory ILAC MemberAB IEC C.A. SystemSecretariat Testing Laboratory accredited by COFRAC and accepted by the IECEE Selection and appointment of: +

  38. + Short list of pre-selectedTechnical Assessor(s) Technical Assessor Technical Assessor Lead Assessor Lead Assessor Data Base of a Common Pool of Registered Technical Assessors COMMON ASSESSMENT REPORT COMMON ASSESSMENT REPORT Unified Reassessment modelExample for Certification Body IEC C.A. SystemSecretariat IAFMember AB Certification Body accredited by NATA and registered by the IECEE System Selection and appointment of: Australia + ON-SITE ASSESSMENT

  39. Achievement: MoU IEC-OIML The OIML and the IEC have agreed to consult each other on any technical issues of joint interest and shall provide each other with any information or documentation concerning matters of mutual interest, particularly concerning legal metrology related to standardization and conformity assessment within the IECEE.

  40. THE FUTURE / THE FUTURE LOOKS BRIGHT / LOOKING AHEAD

  41. The future is now

  42. Future exciting challenges • The need to have a strategic global market relevance. • The need to position international standardization and Conformity Assessment as a strategic business tool. • The recognition that global reach is not an easy objective. • The acceptance that innovation and adding business value takes hard work and open collaboration. • The peoples of the world recognize that standardization and Conformity Assessment improve their lives. • The National Committees are the foundation for achieving national and global relevance.

  43. IECEE is at the forefront… We are at the forefront of new exciting challenges in Conformity Assessment and the IECEE System is aiming at to be the right player, a player that can be trusted. IECEE takes Conformity Assessment Further!

  44. Au revoir • CAB Meeting 2013-10-22 New Delhi

More Related