Modernizations

Explore the modernization efforts of Metro Rio including the extension of Line 1, improving intermodal integration, enhancing transit rationalization, and connecting urban areas efficiently.

martinezi
Download Presentation

Modernizations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Modernizations

  2. Modernization of OCC

  3. Events in Rio de Janeiro 2014 – Copa do Mundo 2011 – V Jogos Mundiais Militares 2016 – Jogos Olímpicos 2013 – Copa das Confederações

  4. Maracanã Station Maracanã Station Metrô Rio

  5. 1968 – METRO’s ORIGINAL CONCEPT

  6. Atlantic Ocean Suburban railways lines Metro lines 1 and 2 Suburban railways lines Metro lines 1 & 2 3 BRT systems (Link C, T5 Corridor and Barra – South zone) 0 1 2 3 km High Performance Transport Ring

  7. High Performance Transport Ring • Railway • Metrô • BRT

  8. New Project

  9. New Project • The new project extends Line 1, connecting Ipanema to Barra, and passes through high urban density areas. This layout will ensure best cost/benefit relation to the population since it considers infrastructure for intermodal integration in the nearby areas, and will also improve the transit as long as it creates opportunities of transport rationalization. • Extension: 13.5 km • Passengers in a weekday:230,000 • Distance between stations: 2.25 km • Number of new stations: 6 • Fare: R$ 3,10 • Journey time: • Between Jardim Oceânico and General Osório stations: 15min30sec. • Between Jardim Oceânico and Carioca (Downtown) stations: 33min40sec.

  10. New Project

  11. New Project

  12. THANK YOU! JOUBERT FORTES FLORES FILHO Institutional Relations and Human Resources Director METRÔ-RIO E-mail: joubert@metrorio.com.br Phone: 55 21 32116301/ Fax 55 21 32116308