1 / 8

China Shipping Container Lines (HK) Co., Ltd

China Shipping Container Lines (HK) Co., Ltd. ( Nansha ). Guangzhou. Huangpu. Zhaoqing. Foshan. Xintang. Panyu. Dongguan. Lanshi. Gaoyao. Rongqi. Beijiao. Lianhuashan. Taiping. Gaoming. Heshan. Nansha. Xialan. Yantian. Chiwan. Jiangmen. Zhongshan. Xinhui. Shekou. Zhuhai.

marvinbland
Download Presentation

China Shipping Container Lines (HK) Co., Ltd

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. China Shipping Container Lines (HK) Co., Ltd ( Nansha )

  2. Guangzhou Huangpu Zhaoqing Foshan Xintang Panyu Dongguan Lanshi Gaoyao Rongqi Beijiao Lianhuashan Taiping Gaoming Heshan Nansha Xialan Yantian Chiwan Jiangmen Zhongshan Xinhui Shekou Zhuhai Hong Kong Taishan Doumen Macau Pearl River Delta & Nansha

  3. The first phase of the Nansha port

  4. The first phase of the Nansha port

  5. The first phase of the Nansha port • The first phase of the Nansha port consists of four 50,000-ton multi-purpose berths with a total of 1,400m in length • The depth of the harbor basin is –13m • The total area is 1,820,000m2 and the CY is 900,000m2 • It is equipped with 12 post-Panamax quayside container cranes, 36 rubber-tyred gantry cranes and a batch of mobile equipment

  6. Second-phase expansion project • The second-phase-expansion project will have four 100,000-ton berths with an annual total capacity of 1.2-1.5 million twenty-foot equivalent units (TEUs) • The second-phase-expansion project will cost more than 2.65 billion yuan (US$320 million) and it is expected to be completed before the end of 2007 or early 2008.

  7. 28th Sept, 2004Xin Yang Zhou V.15E first calling at Nansha Port

  8. AAS and ANW1 Services Both Call Nansha

More Related