1 / 60

Operational verification in Poland (preliminary results)

This work report presents the installation and implementation of VERSUS for verification of surface parameters and precipitation at 56 SYNOP stations in Poland. Methods include model runs at 00 UTC with evaluations for continuous parameters and various precipitation thresholds over the period of June 2008 to July 2009. Seasonal analysis and different time windows are used.

marypharris
Download Presentation

Operational verification in Poland (preliminary results)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Operational verification in Poland(preliminary results) Joanna Linkowska Katarzyna Starosta Institute of Meteorology and Water Management COSMO General Meeting, Offenbach, 7-11 September 2009

  2. Work Report in WG5 in Poland • VERSUS: Installation and implementation • Verification of surface parameters and precipitation using 56 SYNOP stations • Common plots • Data: June 2008- July 2009

  3. METHODS • Run 00 UTC – model 14 km • ME, MAE, RMSE for continuous parameters: T2m, MSLP,Wspeed, W dir. • Period seasonally (JJA,SON,DJF, MAM) • Precipitation 12h and 24h (thresholds 0.2, 0.4, 0.6, 0.8, 1, 2, 3, 4, 5, 6, 7, 8, 9,10, 12, 14, 16, 18, 20) scores: FBI, POD,FAR,ETS

More Related