An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Confined Disposal Facilities and In Situ Capping • Site characterization / selection • Engineering design • Operational considerations • Contaminant pathways and controls • Long-term management • Monitoring • http://www.youtube.com/watch?v=Lbh9c0noR4s

  2. Potential Contaminant Release Pathways for Dredging and Upland Disposal

  3. Confined Disposal Alternatives

  4. Engineering Issues • Reduce Contaminant Pathways • Disposal pathways • Physical disturbance • Seepage • Optimize Capacity • Safely dispose of the greatest amount of material in the smallest area

  5. Physical Disturbance • Excavation and removal of contaminated sediments • Erosion and Scour at the disposal site • Slope Stability • Nature of underlying materials • Stability of existing and future slopes • Intended end use of site • Consolidation and settling • Cap Properties

  6. Seepage • Excess pore water in upland sites • Consolidation and compaction induced seepage • Groundwater-driven seepage

  7. Other Considerations • Dredged disposal volume • Area of land desired • Habitat mitigation requirements • Cost comparisons

  8. Local Example: Ross Island

  9. Ross Island Locator Map

  10. Aerial Photo

  11. History of the Ross Island Sand & Gravel Site • July 1926 RISG acquires the islands and ownership is established over the area defined by the low water line surrounding the islands • October 1967 RISG issued removal permit following effective date of Oregon’s removal law • 1972 RISG proposed to mine entire islands away - denied by Oregon AG • 1972 RISG proposed to connect the northern ends of the islands forming a private pond - denied by COE

  12. RISG History – Cont’d • 1979 RISG’s removal permit amended to include fill • 1980 City of Portland issued Conditional Use Permit specifying details of eventual reclamation • 1983 RISG began accepting fill materials from outside sources • 1992 first confined disposal event of Port of Portland dredged sediments

  13. Typical Cross Section

  14. Disposal Methods

  15. Potential Contaminant Migration Pathways - Disposal Processes

  16. Potential Contaminant Migration Pathways - Groundwater Transport (Present and Future)

  17. Potential Contaminant Migration Pathways - Physical Disturbance

  18. Groundwater Movement through Cells

  19. Potential Groundwater Transport from Containment Cells • Upward groundwater flow • Cap design minimizes discharge via this sort of flow • Predicted discharge concentrations below risk-based criteria.

  20. Potential Physical Disturbance of Containment Cells • Natural erosion (floods). • Human influence (mining). • Geotechnical stability.

  21. Slope Instability

  22. Potential Physical Disturbance of Cells • Minimal erosion potential due to a control dike. • Mining controls would avoid future impacts. • Slopes are presently receiving fills.

  23. RISG CDF: Conclusion • Final decision not yet made about CDF and the future of the island as a city park or preserve • Engineering studies strongly suggest the CDF is presently secure and presents an acceptable risk

  24. GREENFill Areas ConsideredYELLOWFill Areas ProposedREDAreas to be Dredged

  25. Wyckoff/Eagle Harbor W. Fish, Portland State University

  26. Wyckoff/Eagle Harbor • Bainbridge Island, in Central Puget Sound • 3,780-acre site • Land use in the area is predominantly residential, with some commercial and industrial uses • The harbor supports several fish resources, a wide variety of resident and migratory birds, and other wildlife

  27. Eagle Harbor

  28. Wyckoff/Eagle Harbor • Sources of Contamination: • Inactive 40-acre wood treating facility owned by Wyckoff • Adjacent 500-acre Eagle Harbor • Other upland sources of contamination (Shipyard)

  29. Site History • Shipyard operated from 1903 to 1959 on the northwest shore of Eagle Harbor, resulting in releases of metals and organic contaminants. • 1905 to 1988, wood treating operations were conducted on the southeast shore involving pressure treatment with creosote and pentachlorophenol W. Fish, Portland State University

  30. Discovery • During the 1970s, efforts were made to address oil seepage on beaches adjacent to the Wyckoff • 1984: NOAA investigations of the Harbor revealed that sediment, fish, and shellfish from Eagle Harbor contained elevated levels of PAHs W. Fish, Portland State University

  31. The Response to Discovery • EPA required Wyckoff to conduct environmental investigation activities under RCRA • Washington State required immediate action to control stormwater runoff and seepage of contaminants

  32. Response, Cont’d • September 1985: Proposed to the Superfund NPL • 1985:Washington State Hazardous Waste Cleanup Program, (Ecology): Preliminary Investigation of sediment contamination in Eagle Harbor

  33. Response, Cont’d • 1985: NOAA completed a study relating the presence of PAHs in sediment to the high rate of liver lesions in English Sole from Eagle Harbor • March 1987, Wyckoff Company entered into an Administrative Order on Consent with EPA for further investigation of the facility (RI/FS)

  34. Historical Sources • Preservative chemicals were stored in tanks on the property. • Contamination of soil and ground water at wood treatment facility led to seepage into adjacent sediments. • Wastewater discharged into Eagle Harbor for many years; storing treated pilings and timber in the water continued until the late 1940's. W. Fish, Portland State University

  35. Contaminants of Concern • Shipyard: Levels toxic to marine life • Polyaromatic hydrocarbons (PAHs) and other organics • Heavy metals such as mercury, copper, lead, and zinc

  36. Contaminants of Concern • Wyckoff facility, soil and groundwater are contaminated with: • Creosote • Accompanying PAHs • Pentachlorophenol (PCP; “penta”)

  37. CERCLA Operating Units • 1991, EPA defined three operable units at the Wyckoff/Eagle Harbor site: • Wyckoff (OU1) • East Harbor (OU2) • West Harbor (OU3) • Wyckoff Facility groundwater (OU4, 1994) W. Fish, Portland State University

  38. Selected Remedial Actions • Dredging, excavating dewatering intertidal sediment that exceeds levels of 5 mg/kg mercury and/or lower, moderate PAH concentrations • Approximately 1,000 to 7,000 cubic yards • Solidification/stabilization, as necessary, to comply with disposal rules • Transporting sediment, which cannot be treated to meet rules offsite for disposal at a RCRA-permitted (Subtitle C or D) landfill

  39. Remedial Actions (cont’d) • Treating dewatering wastewater onsite using carbon adsorption before discharge into the harbor • Capping the sediment in areas of high concern with a 1- meter thick layer of clean sediment; • Placing a thin layer of clean sediment in subtidal areas of low to moderate concern to enhance natural sediment recovery

  40. Remedial Actions (cont’d) • Long-term environmental monitoring • Institutional controls to prevent exposure to contaminated fish and shellfish. • The estimated cost is up to $16,000,000 • Most work done but site still on NPL

  41. Eagle Harbor Cap Areas W. Fish, Portland State University

  42. East Harbor Capping (OU2) • Sept 1993-March 1994, EPA and the Corps of Engineers covered contaminated sediments in the East Harbor • Cap of clean sediment at water depths of 17 m and 13 m, respectively. • Sediment was dredged from the Snohomish River as part of an annual project for ship navigation W. Fish, Portland State University

  43. Capping Methods

  44. Capping Methods • Split Hull: Fast but uneven. W. Fish, Portland State University

  45. Capping Methods • Hydraulic washoff: W. Fish, Portland State University

  46. West Harbor CDF (OU3) W. Fish, Portland State University

  47. Final sediment cleanup actions • Monitoring the success of natural recovery in intertidal areas • Monitoring contaminated areas where active remediation cannot be implemented.