1 / 3

SLIMATIC MORTAR MOULDING

SLIMATIC MORTAR MOULDING. DEMO PRESENTATION. SLIMATIC MORTAR MOULDING PROPERTIES. The 10 to 12 seconds time required to tamp 32 times in 4 rounds is always respected. Respects the 2 minutes and 30 secondes after completion of the original mixing of the mortar batch.

Download Presentation

SLIMATIC MORTAR MOULDING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SLIMATIC MORTAR MOULDING DEMO PRESENTATION

  2. SLIMATIC MORTAR MOULDINGPROPERTIES • The 10 to 12 seconds time required to tamp 32 times in 4 rounds is always respected. • Respects the 2 minutes and 30 secondes after completion of the original mixing of the mortar batch. • Respects the tamping sequence.

  3. SLIMATIC MORTAR MOULDINGPROPERTIES • Three cube compartments prepared at the same time (equivalent to three hands).

More Related