MAMC UPDATE. LTC Paul Mann. WRMC on 30 September 2009. WRMC on 1 October 2009. Leadership changes. MAMC Commander & WRMC Commander functions split WRMC: MG Horoho MAMC: COL Penner Separate WRMC stood up No longer part of MAMC Staff departure Multiple bosses.

Download Presentation

MAMC UPDATE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAMC UPDATE • LTC Paul Mann

  2. WRMC on 30 September 2009

  3. WRMC on 1 October 2009

  4. Leadership changes • MAMC Commander & WRMC Commander functions split • WRMC: MG Horoho • MAMC: COL Penner • Separate WRMC stood up • No longer part of MAMC • Staff departure • Multiple bosses

  5. BRAC in the Pacific North West • Ft Lewis & McChord AFB merged • Joint Base Lewis McChord • MAMC assumed command of the Air Force Health Clinic on JBLM-McChord • Army Lab Officer assigned to supervise the Lab at Air Force Clinic just as they entered accreditation window

  6. Recent Lab Leadership Changes • LTC Mann: Lab Manager (July 09) • LTC Mahlen: Microbiology (Aug 09) • CPT(P) Sterling: Asst Lab Manager • LT Cooley: Path Support (March 2010)

  7. First 4 Months • FDA • MEDCOM BSL3 PreOp • CDC LRN • JC lab inspections at POM & Umatilla • McChord lab CAP • AABB

  8. 2009-10 Updates: • Re-establish in House Testing • GC/CT • Molecular Diagnostics • Hepatitis • Parasitology

  9. Front End Automation • Beckman Power Processor Before

  10. Front End Automation • Beckman Power Processor During

  11. Front End Automation After

  12. BSL-3 • MEDCOM Pre-Op inspection September 2009 • Currently at the 95% solution • Pending OH policies approval by EBOD • Project April opening

  13. Short Term • New QA coordinator • Establish an updated QA plan • Implement April 2010 • CAP window Oct 2010

  14. Long Term Plans • Consolidate Chemistry Testing Platform to a single manufacturer • Install “robotic” automation lines in Core Lab • enGen system for Chemistry • Beckman Coulter for hematology

  15. MAMC Impending Updates • Ground Breaking for Women’s Health Clinic March 2010 • WTB Barracks ground breaking April 2011 • Location is the hospital parking lot • New (Nisqually) Health Clinic to open May 2010 • 2 CBPCC to open 1 October 2010