1 / 1

Sunshine Skyway By: Drew Smith

Sunshine Skyway By: Drew Smith. Location: St. Peterburg & Bradenton Florida C ompletion Date & cost: 1987 April $244 million Length : 4 miles 29,040 feet longest single s pan 1,200 feet Type: Cable – Stayed Engineers: Fig & Muller Engineering group

mattox
Download Presentation

Sunshine Skyway By: Drew Smith

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sunshine Skyway By: Drew Smith Location: St. Peterburg & Bradenton Florida Completion Date & cost: 1987 April $244 million Length: 4 miles 29,040 feet longest single span 1,200 feet Type: Cable – Stayed Engineers: Fig & Muller Engineering group What is the purpose of this bridge: They needed a bridge to span Tampa Bay connecting St. Peterburg

More Related