An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006

  2. LINAC I (4.90GHz) No. 3 No. 2 V e M 7 0 5 1 n o i t c a r t x E B=1.539T max Matching-Section 43 turns 4.90GHz 10m I n j e c t i o n 8 5 5 M e V No. 1 No. 4 LINAC II (2.45GHz) The Harmonic Double Sided Microtron (HDSM) for MAMI C

  3. Status at the Glasgow-Meeting:

  4. The next months (Sept): • Final setup and technical commissioning of the 4.90 GHz linac, rf-systems, • magnets and beam diagnostics devices of the linac axis. • first injection test

  5. Vacuum tubes and steering magnets 193 tubes („harp“), 384 steering magnets

  6. 90° bending dipoles vacuum chambers All 4 dipole vacuum chambers were fully manufactured at KPH (welding of Al bars and plates) and are installed. 7m first vacuum chamber manufactured in the Institute free aperture in x: ± 8mm and y: ± 7mm

  7. Next steps: (2006) • first tests in diagnostic pulse mode (very low beam power) • up to max. energy of 1.5 GeV • guiding beam in the beam transfer tunnel • tests in cw-operation and high current (100mA) • tests of all beam transfer systems (A1, A2, A4) • first tests for experiments (only 1.5 GeV) • From 2007 on: • beam for experiments (1500 MeV, tests, data taking) • optimal orientation of polarization in all halls and for all energies • possible by use of Wien-filter • variable beam extraction (in steps of ~15 MeV between 872 MeV • and 1320 MeV, and 1500 MeV)

  8. Beam Extraction: correction magnets correction magnets

  9. fixed extraction magnet (1.5GeV) turn 43 turn 30 turn 1 movable extraction magnet (0.87GeV – 1.32GeV) Extraction System of the HDSM Extraction beam paths