1 / 9

In August was the Jackal born The rains fell in September Now such a fearful flood as this

The uncertainty in predicting flash floods in the Mediterranean Storms: the role of an observational network Franco Siccardi Interuniversity Research Center on Environmental Monitoring of the Universities of Genova and Basilicata

mauve
Download Presentation

In August was the Jackal born The rains fell in September Now such a fearful flood as this

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The uncertainty in predicting flash floods in the Mediterranean Storms: the role of an observational network Franco Siccardi Interuniversity Research Center on Environmental Monitoring of the Universities of Genova and Basilicata and Environmental Engineering Department of the University of Genova In August was the Jackal born The rains fell in September Now such a fearful flood as this Says he, I can’t remember. R.Kipling, Second Jungle Book, 1907 f.siccardi-alghero

  2. 2004? f.siccardi-alghero

  3. time and space scales 22/09/1992 - 10.45 debris at bridge pier flooding starts bed scouring 22/09/1992 - 15.30 22/09/1992 - 15.40 22/09/1992 - 15.45 extensive flooding bridge collapsed f.siccardi-alghero

  4. time and space scales La Barbera, P.; Lanza, L. G. 2001 On the cumulative area distribution of natural drainage basins along a coastal boundaryWater Resour. Res. Vol. 37 , No. 5 , p. 1503 f.siccardi-alghero

  5. uncertainty at the meteo scale interface f.siccardi-alghero

  6. Single Site DETERMINISTIC PROBABILISTIC GCM EPS LAM LEPS Downscaling DHM f.siccardi-alghero Forecasted Hydrograph CDF of peak flow

  7. multicatchment distributed warning f.siccardi-alghero

  8. Multi-catcment approach PROBABILISTIC EPS LEPS Downscaling Exceedence probability curves DHM f.siccardi-alghero

  9. f.siccardi-alghero

More Related