A Study of Proton-Proton Collisions at the LHC The Ohio State University - Task A.2 B.G. Bylsma, L.S. Durkin, D. Fisher, J Gilmore, J.H. Gu, D. Larson, D. Herman, T.Y.Ling, C.L. Kim, P. Nylander, V.J. Sehgal, M. Studer,C. Rush
Collecting and Analyzing the Physics will be difficult ... Muon Chambers will clearly play a major role in LHC experiments
U.S. Endcap Muon System Alabama, UC Davis, UCLA, UC Riverside, Carnegie Mellon, Fermilab, Florida, Stoney Brook, Northwestern, Ohio State, Purdue, UT Dallas, Wisconsin
Electronics Overview • -Cathode Strip Chambers • 6 layer modules • anode wire hits in azimuth direction • induced cathode strips in radial direction • Environment is Demanding • Singles Rate ~100 KHz/strip • Track Rate 300 KHz/chamber • - Main Functions of Electronics • generate trigger primatives for Level-1 • - identify local charged track segments • using both cathode and anode info • acquire precise muon information for • offline analysis • -cathode strips: precision azimuthal • position from interpolation of induced • strip charges • - anode wires: precision timing; • course radial position from ganged • wires.
Momentum Resolution BMU/EMU Only Momentum Resolution FULL CMS
CSC Electronics Organization • Cathode Preamp/Shaper Asic - Ohio State • SCA ASIC - U.C. Davis • Cathode Readout Control - Ohio State • Comparitor ASIC - UCLA/CERN • Cathode PC Board - Ohio State • Anode Preamp Shaper Disc ASIC - CMU/PNPI • Anode LCT ASIC - UCLA • Anode PC Board - UCLA/CMU/PNPI • Motherboard DAQ - Ohio State • Motherboard Trigger - UCLA • DDU Board - Ohio State • Low Voltage Distribution - Wisconsin
Front-End Electronics Organization 2268 cathode boards 1980 anode boards 480 motherboards
Cathode Preamp/Shaper ASIC • 5 pole semi-gaussian shaper • 100 nsec peaking time • 1 pole/1 zero tail cancellation • return to baseline in 400 nsec 4 channel prototype - AMI 1.8 u
Noise • 1 % at Landau Peak -> 150m Resolution • kT limited FET amplifier, 7000 e’s at 250 pF
12 Bit Dynamic Range • 8 bits for Landau peak • 2 bits for Landau tail • 2 bits for gas gain variation • Good Linearity • < 1% from 0 to 15 MIPs
EMU Radiation and Charged Track Backrounds
Cathode FE Board (July 1999) • Buckeye Preamp/Shaper • Analog Storage + Controller • 12 bit ADC’s • Digital Trigger Primitives • 40 Mhz Word Transfer to Motherboard
Cathode FE Board Status • BUCKEYE Preamp/Shaper Finalized • Improvements for 1999: • rate sensitivity 15X better • latchup fixed • Final Prototype due from AMI late August • Preproduction run September/October • UC Davis SCA ASIC • Improvements for 1999: • New design with LVDS signals due AMI late Aug. • Preproduction run September/October Much faster 400 nsec digitization 150 nsec digitization
Trigger 1/2 Strip Generator • 2nd Iteration Completed • Presently testing • Hopefully Complete • OSU SCA Controller • Uses XLINX FPGA • Design Completed • Board Layout • Third Iteration works well • One more board before production
Analog Storage Switch Capacitor Array (SCA) • Free Running 50 nsec Samples • Charge stored in capacitor array • sample baseline (2 samples) • 2-track resolution (3 samples) • Chambers are self triggered • trigger logic determines good track • in 500 nsec
CFEB connectors Control FPGAs JTAG CCB TMB CLCTB ALCTB FIFOs (16K,75 MHz) GLINKs CC TM CLCT ALCT Optical transceiver • DAQ Motherboard 1999 • Buffer/Event Builder/optical readout for all • boards: cathode, anode, trigger • 8 16K Fifos, FPGA controllers • 75 MHz Optical Link
Counting House Electronics • DDU Board • Prototype, Final System with onboard • pentium • HP GLINK (1.5 Gbit/s, 75 Mword/s) • 33 MHz PCI into Personal Computer
Results from Integration Test Same noise at 40 MHZ as at 2.5 MHZ ! • Chamber and Electronics shipped • to CERN this morning • Test Beam should start Mid August
CERN Test Beam 1998 First Test of FE Electronics System: 3 96 channel anode FE Boards 3 96 channel cathode FE Boards 3 48 channel LCT trigger boards 1 trigger motherboard 1 DAQ motherboard Slow Control/JTAG Test at CERN H2 and X5 Beamlines 10-225 GeV Beam 740 GBq Cs 137 Source
Cathode Offline Resolution Spacial Resolution: -Single Layer Strip Position (cm) - 6 layer chamber ~ 100 m Time Resolution: - single layer ~ 7 nsec
Conclusion Schedule is Tight US CMS Master L-1 Schedule -Start EMU installation 1/16/03 - Finish 8/29/04 EMU Electronics Schedule - Finish R&D by 12/1999 - Full pilot system 2/2000 - Construction 6/2000 Cathode Board on Schedule ! Realistic DAQ Motherboard built/tested ! Control Room DAQ boards in second design stage ! FE Board and ASIC Production Should Start on Time !