Title: text size 36 pt.

Title: text size 36 pt. Karl J. Jacobs Center for Science and Math. Text size 28 pt. Project Features. ACADEMIC 5 Life Science Labs / 1 Stealth Lab (4 Current Labs) Prep/Storage 1 Cadaver Lab 1 Greenhouse Prep/Storage 1 Instrument Room 2 Student Resource Labs Classrooms

maxim
Download Presentation

Title: text size 36 pt.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Title: text size 36 pt. Karl J. Jacobs Centerfor Science and Math • Text size 28 pt.

  2. Project Features ACADEMIC • 5 Life Science Labs / 1 Stealth Lab (4 Current Labs) • Prep/Storage • 1 Cadaver Lab • 1 Greenhouse • Prep/Storage • 1 Instrument Room • 2 Student Resource Labs • Classrooms • 10 Large (includes 2 Stealth Labs) • 5 Small • 1 Math Lab (2 Rooms) • Student Life Space • 59 Faculty Offices • Adjunct Office Space for 16 • Faculty Support Office (FSO) Space • Departmental Office Space • IT Office • BUILDING AND CONSTRUCTION • Pursuing LEED Gold Certification • 23 Alternate Bids • All Faculty Requests have been Included • 420-Ton closed-loop Geothermal System • Chilled Beam Cooling System • Connecting Link between CL-I and JCSM • 105 New Parking Spaces • Pendulum • Creek Enhancements • Photovoltaic System • Greenhouse • Green Roofs

  3. Pursuing LEED Gold – 60 Points Required Currently at 68 • Energy Savings Measures • 420 ton closed-loop geothermal heating and cooling system • Chilled beam cooling system • Variable air volume air handling units • Energy recovery on air handling units • Variable volume heating and cooling pumps • High efficiency domestic water heating system • Variable frequency drives for motors • Building-integrated photovoltaics • Transformers bearing Energy Star labels • High efficiency light fixtures • Lighting controls • Occupancy sensors • Daylight harvesting sensors • Multiple switching zones • Use of low mercury lamps • Thermally efficient glazing (low-E coatings, ceramic fritting) • Reflective white roofing membrane • Enhanced commissioning Leadershipin Energy & Environmental Design • Upon completion, Rock Valley College will likely be • the first community college in Illinois to have two • LEED Gold projects on its campus.

  4. Closed-Loop Geothermal System • The closed-loop Geothermal system include (8) water-cooled heat pump units, primarily loop water pumps, a 164 vertical well geothermal bore field, and associated piping. This system will work to create jobs, reduce energy consumption and greenhouse gas emissions, and leverage grant funding in a learning environment that can promote these initiatives to future generations. • ADVANTAGES • More efficient than the existing central heating and chiller water plant • Places the project in a better position to obtain LEED Gold Certification than more traditional systems • Excess capacity will be shared with CL-I building • Supports the College’s long standing “green” philosophy • Can be used as a teaching tool for sustainable design • SYSTEM ECONOMICS • Geothermal System Cost $1,783,000 • Less Conventional System Cost ($ 695,000) • DCEO Grant (Pending) ($ 420,000) • ICECF Grant (Pending) ($ 90,000) • Remaining Project Cost $ 578,000 • Modeled Annual Energy Cost Savings Compared to Traditional System: $76,000 • Simple Payback (Including Grants) 7.6 years

  5. Exterior Elevations South Elevation North Elevation

  6. Exterior Elevations East Elevation West Elevation