An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GFOAz Spring Training 2006 Alternative Delivery Methods A Procurement Process Presented by Dan Zenko Herman Koebergen

  2. Agenda • History • Project Preparation • The Procurement Methods • Q & A

  3. Arizona History • Prior to August 15, 2000 • Low Bid Construction • QB for A&E • After August 15, 2000 • Added • Design-Build (D/B) • Construction Manager at Risk (CM@R) • Job Order Contracting (JOC)

  4. Arizona History • Revisions • 2003 • Minor clean up • 2005 • Limits • Addressed horizontal construction • Subcontractors • Reporting eliminated

  5. Delivery Methods • Design-Bid-Build • Design-Build • Construction Manager @ Risk • Job Order Contracting

  6. Before You Start • Define Scope/Budget/Program • Project approval • Decide early on delivery method • Identify potential project delays • Procurement limitations by funding source

  7. Ability to fast track Open book approach Ability to pre-qualify Contractors involved early Collaborative approach Focus on project’s best interest Early cost feedback Rewards performance Higher quality Better risk mgmt Fewer disputes/claims Based on trust Potential savings Customer oriented No or reduced change orders Alternate Delivery Method?

  8. Peoria’s Drivers of Change • Speed to market demands • Reduced owner resources • Transference of risk • Less tolerance for conflicts • Cost control

  9. Peoria’s Expectations

  10. Disclaimer This is for information purposes only, please seek advise from your legal council before using the processes described in this presentation

  11. Design-Bid-Build

  12. Design-Bid-Build • Traditional method • Separate, sequential contracts • No formal relationship between A/E & GC Owner Designer

  13. Architects & Engineers • Architect/Engineer hired using Qualification Based Selection (QBS) • Direct Select • Statement of Interest & Qualifications • No pricing allowed

  14. A&E: Direct Select < $500,000 Engineer < $250,000 Architect • Negotiate Scope of Work and Fees Caution on usage

  15. Caution on usage • Use sparingly • Adjacency • Small dollar

  16. A&E: SIQ

  17. Construction Services • Contractor hired using Price Based Selection

  18. Priced Based • Fixed Price • Fixed unit cost • Estimated quantities • Lump Sum • Limited Schedule of Values

  19. Break

  20. Design-Build

  21. Design-Build • Single point of contact for design & construction • Flexible sequencing Owner

  22. A&E: Design/Build

  23. Negotiation StepsSeparate or Sequential • Pre-Construction Services • Guaranteed Maximum Price (GMP)

  24. Negotiation StepsSeparate or Sequential • Preconstruction Services • Design & Programming • Mitigation of Unknowns • Schedule • Determine GMP

  25. Negotiation StepsSeparate or Sequential • Guaranteed Maximum Price (GMP) • Construction costs • Overhead/fees • FF&E • Contingency Owner/Contractor

  26. Construction Manager @ Risk

  27. CM@R • Separate Contracts • Design & Construction Sequential or Concurrent • Transfer Risk Owner Designer

  28. CM@R

  29. Negotiation StepsSeparate • Preconstruction Services • Design & Programming • Mitigation of Unknowns • Schedule • Determine GMP • Guaranteed Maximum Price (GMP) • Construction costs • Overhead/fees • FF&E • Contingency Owner/Contractor

  30. Break

  31. Job Order Contracting

  32. JOC • Standby Construction Contract • Work performed as job orders issued • May include • design • pre-construction • operations • maintenance Owner

  33. JOC

  34. Pricing • Cost Index Services (i.e. RS Means) • % discount • Request Pricing • Compare to historical costs

  35. Contractual Considerations

  36. Contractual Considerations • Required • Federal grant requirements • Bonds • Insurance • Cancellation • Right to Audit • Open Book

  37. Contractual Considerations • Type of Contract • Design • Construction • Both • Transfer Risk • Substantial /Final Completion • Schedule • Monitoring • Approval as to Form

  38. Contractual Documents • Construction Owners Association of America • www.coaa.org • The American Institute of Architects • www.aia.org • The Associated General Contractors of America • www.agc.org • The American Council of Engineering Companies • www.acec.org

  39. Q & A